知末
知末
创作上传
VIP
收藏下载
登录 | 注册有礼
知末案例   /   公共空间   /   健身房   /   Dake Wells Architecture

预算紧张下的幼儿园健身房扩建

2019/08/29 16:21:27
查看完整案例
微信扫一扫
收藏
下载
翻译
Architect:Dake Wells Architecture
Location:Hermitage, MO, USA
Project Year:2016
Category:Nurseries Wellness Centres
Designed on a tight budget, the new gymnasium and music room were located to take advantage of existing underutilized locker rooms as well as improve the overall campus connectivity by connecting an existing 2nd story gym back to the main level.
The golden honeycomb exterior designates the new facility entrance while double-height doors to the gym and music room allows for light and views in and out. Designed as a simple prefabricated metal building the bright white interior is contrasted by highlights of the schools colors, yellow and purple.
▼项目更多图片
预算紧张下的幼儿园健身房扩建-7
预算紧张下的幼儿园健身房扩建-8
预算紧张下的幼儿园健身房扩建-9
预算紧张下的幼儿园健身房扩建-10
预算紧张下的幼儿园健身房扩建-11
预算紧张下的幼儿园健身房扩建-12
预算紧张下的幼儿园健身房扩建-13
预算紧张下的幼儿园健身房扩建-14
预算紧张下的幼儿园健身房扩建-15
预算紧张下的幼儿园健身房扩建-16
南京喵熊网络科技有限公司 苏ICP备18050492号-4知末 © 2018—2020 . All photos and trademark graphics are copyrighted by their owners.增值电信业务经营许可证(ICP)苏B2-20201444苏公网安备 32011302321234号
客服
消息
收藏
下载
最近