知末
知末
创作上传
VIP
收藏下载
登录 | 注册有礼

希腊 ecoSuites 酒店

2018/10/05 02:18:19
查看完整案例
微信扫一扫
收藏
下载
翻译
Architects:Alex A. Tsolakis Architecture
Area :900 m²
Year :2018
Photographs :Alex A. Tsolakis
Manufacturers :  Caneplex, 157+173 designers, Alumil, BRIGHT, Pyramis Group, ScarabeoCaneplex
Architectural Design :Alex A. Tsolakis, Eva Besmerti
Lighting & Furniture Design : Alex A. Tsolakis, 157+173 designers.
Structural Engineer : Andreas Khlioumis. Swimming Pool Engineer: Intel Water
Architectural & Landscape Design : Alex A. Tsolakis, Eva Besmerti
Landscape Design : Alex A. Tsolakis, Eva Besmerti
Lighting : Alex A. Tsolakis
Furniture Design : Alex A. Tsolakis
Country : Greece
希腊 ecoSuites 酒店-13
希腊 ecoSuites 酒店-14
Hotel extension, Tristinika Beach, Greece. The camouflaged hotel. The swimming pool facade (NE-NW) is completely covered with sliding panels clad in local reed that grows on the hotel site. The reed panels hide the full-height glass windows behind them, creating a softer, more discreet, non-reflective facade that blends into the natural surroundings. At the same time, the sliding reed panels provide sun protection and privacy to the inhabitant, as they enable guests to transform their balconies into private outdoor rooms.
The SE-SW facade features vertical wooden planks, that indicate the private entrance to each suite. The wooden facade blocks direct sunlight, while letting the sea breeze circulate through the suites. The rooms of the suites flow into one another, and the huge glass sliding windows blur the boundary between inside and outside. The open floor plan and its orientation work together with the facades, keeping interiors cool during the summer heat. As the new ecoSuites are an addition to an existing hotel, the existing buildings and view orientations had to be considered.
希腊 ecoSuites 酒店-17
希腊 ecoSuites 酒店-18
希腊 ecoSuites 酒店-19
Each suite floor plan is pivoted and shifted within the building envelope for optimum orientation. The design involved local materials, local labour, handcrafted furniture and flooring. Structural steel was utilized for the frame and precast concrete for all the wall partitions. On-site construction time amounted to 4 months for 900m2.
▼项目更多图片
希腊 ecoSuites 酒店-22
希腊 ecoSuites 酒店-23
希腊 ecoSuites 酒店-24
希腊 ecoSuites 酒店-25
希腊 ecoSuites 酒店-26
希腊 ecoSuites 酒店-27
希腊 ecoSuites 酒店-28
希腊 ecoSuites 酒店-29
希腊 ecoSuites 酒店-30
希腊 ecoSuites 酒店-31
希腊 ecoSuites 酒店-32
希腊 ecoSuites 酒店-33
希腊 ecoSuites 酒店-34
希腊 ecoSuites 酒店-35
希腊 ecoSuites 酒店-36
希腊 ecoSuites 酒店-37
希腊 ecoSuites 酒店-38
希腊 ecoSuites 酒店-39
希腊 ecoSuites 酒店-40
希腊 ecoSuites 酒店-41
希腊 ecoSuites 酒店-42
希腊 ecoSuites 酒店-43
希腊 ecoSuites 酒店-44
希腊 ecoSuites 酒店-45
希腊 ecoSuites 酒店-46
希腊 ecoSuites 酒店-47
希腊 ecoSuites 酒店-48
希腊 ecoSuites 酒店-49
希腊 ecoSuites 酒店-50
希腊 ecoSuites 酒店-51
希腊 ecoSuites 酒店-52
希腊 ecoSuites 酒店-53
希腊 ecoSuites 酒店-54
希腊 ecoSuites 酒店-55
希腊 ecoSuites 酒店-56
希腊 ecoSuites 酒店-57
希腊 ecoSuites 酒店-58
南京喵熊网络科技有限公司 苏ICP备18050492号-4知末 © 2018—2020 . All photos and trademark graphics are copyrighted by their owners.增值电信业务经营许可证(ICP)苏B2-20201444苏公网安备 32011302321234号
客服
消息
收藏
下载
最近