查看完整案例
收藏
下载
翻译
Tokyo studio Nikken Sekkei has designed a timber communal building at the Tokyo 2020 Olympic Games' athletes village, which was built using 40,000 pieces of Japanese wood.
The temporary structure, which will serve as the central meeting place for athletes within the Olympic Village, contains a cafe, bank, medical spaces, lounges, hair salons, retail spaces and a media centre.
Top: the building will be used by athletes, officials and guests. Above: it was constructed using 40,000 pieces of Japanese timber
The 5,300 square-metre communal space is located at the Harumi waterfront district of Tokyo on the eastern side of the athletes' village.
It was constructed from 40,000 pieces of sustainably Japanese cypress, cedar and larch, which were "borrowed" from local governments across the country.
Wood was stacked in layers
"Use of wood from different regions throughout the building will express diversity and harmony," said the Olympics in a press release.
"In addition to revitalising the timber industry and contributing to the conservation of sustainable forests, use of Japanese lumber reflects the goal of reducing environmental impacts and realising sustainability by leaving a legacy that attests to the participation of all regions of the country in the Games."
It has wood interiors
Nikken Sekkei arranged the donated timbers to create a structure that draws on the design aesthetics of traditional Japanese buildings.
It is a low-lying, single-storey structure that is clad in long vertically and horizontally arranged beams and was topped with a corrugated metal roof.
Pieces were marked with the names of the donating areas
Inside, wood was arranged in a lattice formation with the structure of the building celebrated and left exposed.
Each piece of wood used in the building was marked with a stamp that detailed the name of the area it was sourced from.
Related story Asao Tokolo 3D prints Tokyo 2020 podiums from donated plastic waste
After the completion of the games, the structure will be dismantled and wood returned to the donating municipalities to be reused in local construction projects.
"Under the project, lumber borrowed free of charge from local governments across Japan will be used to construct the Village Plaza," said the organisers.
"Then after the Games, lumber from the dismantled Village Plaza will be used as a legacy in local governments' public facilities and elsewhere."
The building pictured during construction
Nikken Sekkei previously collaborated with Japanese timber company Sumitomo Forestry to propose building the world's tallest wooden building in Tokyo.
The studio also designed the Ariake Gymnastics Centre for the games, one of only a few venues built specifically for the event.
The building will be dismantled and materials reused
The building is part of the Olympic organisers plan to promote sustainable initiatives at the game.
"Engaging the whole country and prioritising environmental sustainability is a core pledge of the Tokyo 2020 Games," said Tokyo 2020 Vice President Toshiaki Endo.
"[This] project is based on these principles, and is the first initiative of the kind in the history of Olympic and Paralympic Games."
Other initiatives aiming to make the games sustainable include the athletes' beds being created from cardboard frames, podiums made from donated plastic waste and medals made from recycled smartphones.
Related story Japan urged to stop using deforestation-linked wood for Kengo Kuma's Olympic stadium
Images are courtesy of Tokyo 2020.