查看完整案例![](https://cdn.code.znzmo.com/lb_img_space/gotoLogin.png)
![](https://cdn.code.znzmo.com/lb_img_space/gotoLogin.png)
收藏
![](https://cdn.code.znzmo.com/sucai/img/images/download@3x.png)
下载
![](https://cdn.code.znzmo.com/sucai/img/images/translate@3x.png)
翻译
Architect:Kostow Greenwood Architects
Location:New York City, NY, USA; | ;View Map
Project Year:2018
Category:Offices
Fir Tree Partners is a New York City based, private investment firm that invests worldwide in public and private companies, real estate and sovereign debt, managing assets on behalf of leading endowments, foundations, pension funds and sovereign wealth funds.
Founder and now Chairman Emeritus, Jeff Tannenbaum, established Fir Tree Partners in 1994 and immediately distinguished the company by establishing a work and life culture respectful of people and their work environment. What would become known as a “sustainability mission” was at the time, an innovative approach to raise the standards on workplace design for the benefit of the employees.
Fir Tree Partners engaged Kostow Greenwood Architects for four separate office designs beginning in 1999 (NYC - 535 Fifth Ave; NYC – 505 Fifth Ave; Miami; NYC - 55 W 46th) and through incremental and determined decisions, has proven that the relationship-focused financial industry can thrive in a people-centric office designed with the highest standards of wellness.
As a company, Fir Tree Partners is committed to environmentally responsible design that conserves energy and reduces impact on our natural resources. This project was designed to exceed the LEED Silver standard in terms of sustainably sourced materials and MEP systems and controls. Further, in order to support a healthy and productive workplace, many concepts of The WELL Building Standard were incorporated including: improved air quality, drinking water and nourishment, access to natural lighting and lighting control, acoustical and thermal comfort, and ergonomic seating and work-stations.
1. All Architectural Materials and Furniture were specified for low VOC, Particulate
2. Matter, Inorganic Gases and Radon content as well as Fundamental Material
3. Safety: Asbestos, Mercury and Lead Restriction
4. Smoking Ban: No smoking indoors or within 25 ft of the exterior entrance
5. Ventilation Design: Complies with all requirements set forth in ASHRAE 62.1-2013
6. Ventilation Balancing: After substantial completion the Ventilation System was
balanced
7. Construction Pollution Management was enforced throughout the project
8. Building Entryway is Air Sealed
9. Fir Tree Partners has a Cleaning Protocol that incorporates Natural Products
10. No Pesticides are allowed
1. All drinking water is filtered for sediment, microorganisms, dissolved metals,organic pollutants
2. Water is periodically tested and system is maintained
3. Energy efficient Dyson hand dryers installed in core restrooms to reduce paper waste.
1. Fresh fruits and vegetables as well as healthy snacks are provided on a regular basis
2. High calorie juices, snacks and heavily processed foods are not provided
3. Nutritional information is provided
4. Hand washing supplies, clean cutting surfaces and proper cold storage facilities are provided
5. Cafe and Break out Areas are designed with optimum light and convivial spaces
1. Lighting is designed with criteria with a focus on visual acuity, as well as brightness Management with minimum glare
2. Window shades are provided to manage daylight and heat loads
3. Hi Color Rendering Index lamps specified
4. Work surfaces are designed for low reflectivity
5. All offices and workstations are provided with natural daylight
:
1. The building has a gym open to all occupants, with Cardiorespiratory and Muscle Strengthening Equipment
2. Bicycle Storage is provided in the building
3. All workstations are Height Adjustable enabling working while standing or sitting
1. The workspace is 100% Accessible
2. Acoustics are designed to minimize sound transmission within open areas as well as
3. from Conference Rooms and Offices to Open Areas
4. Several Quiet Rooms and a Wellness Room are designed for comfort and privacy
1. The space was designed to be visually pleasing with neutral and warm color accents.
2 . Live plants were incorporated into all open and shared spaces
DEMOLITION AND CONSTRUCTION MANAGEMENT
1-Furniture and materials from the existing space were re-used, re-cycled or properly disposed of
A “Daylighting System” was incorporated to minimize the use of electrical lights
when daylight is adequate
Repurposed wood was used to construct the table and cabinetry in the Cafe
▼项目更多图片