知末案例   /   酒店民宿   /   酒店

Trivago 总部大楼

2020/02/26 03:01:02
查看完整案例
微信扫一扫
收藏
下载
翻译
Architect:SOP Architekten;raum.atelier
Location:Düsseldorf, Germany; | ;
Project Year:2018
Category:Offices
Stories By:SOP Architekten;Master Builders Solutions
The new headquarters for the world’s largest hotel search engine trivago is starting to take shape in Dusseldorf’s Media Harbour. Comprised of two organically shaped structures and large open areas, the corporate campus occupies a prominent location at the foot of Hafenbecken A on Kesselstrasse.
Creatively designed offices, landscaped outdoor areas, expanses of water, a fitness centre and a jogging track around the rooftop garden terrace provide the best possible experience for some 2,000 employees.
The first stage of construction encompasses the six-storey, drop-shaped building, which opens onto the dock. The elongated architecture is divided at its base into two structures that are connected via landscaped inner courtyards. A varied spatial arrangement is created by the horizontally structured façade and the numerous balconies, terraces and loggias. The first phase also includes around 30,000 square metres and 500 parking spaces.
Reconstruction of a 26,000 m2 office area in a six- story horizontally segmented office building in Dusseldorf's media harbor.
-Foot traffic sound insulation in hallways & offices
-Aesthetically appealing & multi-color selection
-Smooth, homogenous, low-emission surface
-Durable & resilient
MasterTop flooring systems fulfil the highest requirements for aesthetics, hygiene and durability. Three MasterTop systems have been selected:
-MasterTop 1324 – Industrial floor (polyurethane resin system)
-MasterTop 1326 – Decorative floor (polyurethane resin system)
-MasterTop 1728 – Industrial floor (epoxy resin system)
-Free color selection 
-Low-emission materials for optimal indoor air quality
-Footstep dampening for sound reduction
-High walking comfort
-Smooth surface and easy to clean
-High mechanical resilience
-High scratch resistance
A visually appealing, resilient flooring solution, and one pleased customer! Altogether, 12.250 m2 of MasterTop flooring systems were laid throughout the building:
-Foyer: 500 m2 MasterTop 1324
-Ground floor to 5th floor: 8.500 m2 MasterTop 1326
-7 staircases, 2nd basement to 5th floor: 650 m2 MasterTop 1728
-Technical rooms, 1st and 2nd basement: 2.600 m2 MasterTop 1728
Master Builders Solutions stands for commitment to the construction sector with a comprehensive portfolio of specialty construction chemicals solutions brought together under a single brand. The expertise and experience from our global construction chemicals team together with the service package of sustainable chemical solutions for the construction, maintenance, repair and renovation of infrastructure and buildings is at the core of what we are.
▼项目更多图片
Trivago 总部大楼-31
Trivago 总部大楼-32
Trivago 总部大楼-33
Trivago 总部大楼-34
Trivago 总部大楼-35
Trivago 总部大楼-36
Trivago 总部大楼-37
Trivago 总部大楼-38
Trivago 总部大楼-39
Trivago 总部大楼-40
Trivago 总部大楼-41
Trivago 总部大楼-42
Trivago 总部大楼-43
Trivago 总部大楼-44
南京喵熊网络科技有限公司 苏ICP备18050492号-4知末 © 2018—2020 . All photos and trademark graphics are copyrighted by their owners.增值电信业务经营许可证(ICP)苏B2-20201444苏公网安备 32011302321234号