知末案例   /   Gutgut

布拉迪斯拉发混凝土工厂改造

2018/03/19 13:00:47
查看完整案例
微信扫一扫
收藏
下载
翻译
Architect:gutgut
Location:Bratislava
Project Year:2017
Category:Offices;Shops;Residential Landscape
Address: Turbínová 13, Bratislava
Investor: Teslová, s. r. o.
Author:
Štefan Polakovič, Lukáš Kordík, Jana Benková, Tomáš Vrtek
Co-authors of architectural study:
Roman Žitňanský, Patrícia Botková, Katarína Bergerová
布拉迪斯拉发混凝土工厂改造-10
Author of Graphic identity and information system:
Ľubica Segečová
Supplier: ise, s. r. o.
Dates:
Project (2015-2016)
Implementation (2016-2017)
Plot area: 2676 m2
Built area: 857 m2
Net floor area: 3695 m²
Built volume: 20100 m3
Author of photographs: Jakub Skokan, Martin Tůma - BoysPlayNice
布拉迪斯拉发混凝土工厂改造-22
The building of Mlynica is part of a large post-industrial area of ​​Light Building Materials in Bratislava. Since 1960s, porous prefabricated concrete blocks, slabs and panels have been produced here. Production took place until 1992. After privatization, the new owners sold off the complex and a gradual disintegration of the structures began.
布拉迪斯拉发混凝土工厂改造-24
The architectural design builds on the structural logic of the original building. The reinforced concrete frame filled with porous concrete masonry façade is retained and new programme is inserted into the existing container. The façade is opened up purposefully in places where it aligns with the new layout, without compromise and with respect to the load-bearing capacity of the existing perimeter structures. The new openings have a free and readable composition as opposed to the original rational mesh of window openings typical of an industrial building.
布拉迪斯拉发混凝土工厂改造-26
The object of Mlynica is vertically divided into three functional blocks. The design of the individual parts of the new programme – event space, administrative premises and flats –communicates via the central space of the former production hall.
布拉迪斯拉发混凝土工厂改造-28
The rigid construction of the structural skeleton is complemented by transparent partitions of the new layout, soft timber infill panels, Profilit walls and exposed media ducts. Three new floors for administration are created within the original concrete hoppers which are made accessible from the central hall.
布拉迪斯拉发混凝土工厂改造-30
The design builds on the contrast between old and new, highlighting the quality of the original building. With this approach it is necessary to get rid of unnecessary layers in order to emphasize the structural logic of the building and thus maximize the potential for its new use. The reconstruction transforms the former industrial complex used for purely technical production into a modern mixed-use building for cultural events, businesses presentation, administration and in smaller part open plan living.
布拉迪斯拉发混凝土工厂改造-32
To see the Mill during the process of reconstruction go to:
布拉迪斯拉发混凝土工厂改造-34
布拉迪斯拉发混凝土工厂改造-35
布拉迪斯拉发混凝土工厂改造-36
布拉迪斯拉发混凝土工厂改造-37
▼项目更多图片
布拉迪斯拉发混凝土工厂改造-39
布拉迪斯拉发混凝土工厂改造-40
布拉迪斯拉发混凝土工厂改造-41
布拉迪斯拉发混凝土工厂改造-42
布拉迪斯拉发混凝土工厂改造-43
布拉迪斯拉发混凝土工厂改造-44
布拉迪斯拉发混凝土工厂改造-45
布拉迪斯拉发混凝土工厂改造-46
布拉迪斯拉发混凝土工厂改造-47
布拉迪斯拉发混凝土工厂改造-48
布拉迪斯拉发混凝土工厂改造-49
布拉迪斯拉发混凝土工厂改造-50
布拉迪斯拉发混凝土工厂改造-51
布拉迪斯拉发混凝土工厂改造-52
布拉迪斯拉发混凝土工厂改造-53
布拉迪斯拉发混凝土工厂改造-54
布拉迪斯拉发混凝土工厂改造-55
The Mill 旧楼改造
南京喵熊网络科技有限公司 苏ICP备18050492号-4知末 © 2018—2020 . All photos and trademark graphics are copyrighted by their owners.增值电信业务经营许可证(ICP)苏B2-20201444苏公网安备 32011302321234号