知末
知末
创作上传
VIP
收藏下载
登录 | 注册有礼

多伦多 Pottery Road 自行车与行人穿越通道

2019/10/16 02:14:41
查看完整案例
微信扫一扫
收藏
下载
翻译
多伦多 Pottery Road 自行车与行人穿越通道-0
Plant Architect: This project is the first component of a larger scheme to provide interpretation, accessibility, and environmental control for the Lower Don Recreational Trail in Toronto. Pressured by its urban location, the site’s heavy usage by cyclists and pedestrians had resulted in numerous unplanned and unsustainable trails, including a widely used but extremely unsafe crossing at Pottery Road. With the fast flow of traffic and a narrow crossing that forced pedestrians and cyclists to cross the road at a dangerously slow pace, users were at risk of serious injury. We addressed these and other safety and environmental issues by designing a new controlled crossing and reconfigured road-island with visual graphics and laser-cut signage to direct and control traffic. The aim was to encourage safe and accessible multi-modal transportation, increase public understanding and appreciation of the Don Valley’s urban ecology, and enhance stewardship of this vast urban wilderness.
多伦多 Pottery Road 自行车与行人穿越通道-2
多伦多 Pottery Road 自行车与行人穿越通道-3
Stitched Panorama
多伦多 Pottery Road 自行车与行人穿越通道-5
多伦多 Pottery Road 自行车与行人穿越通道-6
多伦多 Pottery Road 自行车与行人穿越通道-7
多伦多 Pottery Road 自行车与行人穿越通道-8
多伦多 Pottery Road 自行车与行人穿越通道-9
多伦多 Pottery Road 自行车与行人穿越通道-10
多伦多 Pottery Road 自行车与行人穿越通道-11
多伦多 Pottery Road 自行车与行人穿越通道-12
多伦多 Pottery Road 自行车与行人穿越通道-13
多伦多 Pottery Road 自行车与行人穿越通道-14
多伦多 Pottery Road 自行车与行人穿越通道-15
Landscape Architect: Plant Architect Project location: Pottery Road and Bayview Avenue, Toronto, Canada Design year: 2010 Year Built: 2011
南京喵熊网络科技有限公司 苏ICP备18050492号-4知末 © 2018—2020 . All photos and trademark graphics are copyrighted by their owners.增值电信业务经营许可证(ICP)苏B2-20201444苏公网安备 32011302321234号
客服
消息
收藏
下载
最近