知末案例   /   公共空间   /   艺术馆

Maison des Arts 艺术中心

2020/11/12 22:37:32
查看完整案例
微信扫一扫
收藏
下载
Cultural Center, Charbonnières-les-Bains, France
设计师:Tectoniques Architects
面积:  1150 m²
年份:2020
摄影:Renaud Araud
建造商: Atlas Schindler, ESCOFET, Erco, France Air, Hansgrohe, Lafarge Holcim, REHAU, Schenker Storen, Arval, Asbestos removal, Bealem, Bertholon, Bertrand Duron, B’alu, Charroin Toitures, Dazy, Demolition, Duravit, Fontaine, Forage Clément Gourbiere, +9GHM, Herbadrain, Kwaneer, Lardy, Parquet sols, Sylvanyia, Thalman, Thalmann, VIM-9
Scheduling, Supervision And Coordination:Bâti coordination
Carcass Work, Fluids And Quantity Surveying:Tectoniques Ingénieurs
Wood Structure:Arborescence
Environmental 工程师:eEgenie
Acoustics: Dbvib
Landscaping:Regeneration
Building Control:Bureau Veritas
Health And Safety: Dekra industrial
Landscape Gardening:Espaces verts mont d’or 
Special Foundations:Elts 
City:Charbonnières-les-Bains
Country:France
The Maison des Arts arts centre is a new public facility in Charbonnières-les-Bains, a residential town to the west of Lyon. It is situated in the valley of a small river which runs through the town, along the railway line. The setting is green and leafy, with just a few sparse buildings surrounded by gardens. The building blends into the site harmoniously. It is a generous project with careful attention paid to all four sides. It is also a solitary object which dialogues with its setting on all sides and through its overall silhouette.
The project’s architecture is characterised by the tandem structure. The base, massive and mineral, which follows and absorbs the slope; and the perforated metal roof which stands out against the sky like a light, delicate headdress. The concrete and metal play on the contrast between opacity and transparency, light and weight, light masses, and dark surfaces. The materials are raw and uncompromising. Everything is visible and reveals the perfect coherence between the exterior and interior, between the architectural image and the means of production.
This building is part of a new generation of projects built by Tectoniques. In the continuity of the work already undertaken, certain key points such as the materials, the relationship to the ground, the depth and the construction have been developed to make use of systems that are different from those the architects are known for, in particular “all-wood” building solutions.
The Maison des Arts is situated in a residential neighbourhood, surrounded by villas with large gardens and swathes of trees. However, the selected plot has a number of significant constraints. It is located on a narrow strip between the road (Chemin de la Ferrière) and the railway line. This unexpected backdrop of rails, masts, cables, and overhead lines jars with the leafy landscape surrounding the project. The other major difficulty was the steep slope of the land.
The relative isolation of the building is compensated for by its proximity to other facilities: the town hall, the library, the nursery and primary schools, and the stadium, all situated on the other side of the valley and easily, as well as safely, accessible. The river valley, below the railway line, is a popular walk with residents, along a path which leads to the cinema, then on to the station and central town square. The architects were able to work around the original site which, as well as its limitations, has a number of considerable assets.
The first objective was to make use of the steep slope of the land by using the height difference to integrate part of the programme into the incline. The programme is divided into two: the Maison des Jeunes (youth centre) and the Maison des Arts (arts centre). The former is composed of two large halls dedicated to clubs and associations which operates independently of the rest of the building. It is integrated into the space created when excavating the site, with its own entrance to the north, close to the skatepark. The latter conserves its own access to the south on the upper level, opposite the esplanade and landscaped car park.
From a building perspective, the concrete base serves to absorb the topography and acoustically isolate the facility from the noise of the railway. It uses two very distinct styles. The lower section is smooth. The upper section is formed with a matrix of wooden boards, a nod to Tectoniques’ material of choice. The material used for the base is very fluid concrete, poured and formed in situ, which uses dyed white cement to give a milky, ochre-tinted appearance.
The structure is visually both raw and delicate. The materials are unfinished but the precision of their implementation and the composition of the mix means the final result tends towards more refined materiality. The concrete is also enhanced by the use made of its thickness and mass. For example, the series of circular holes drilled into the facade to let light into the building, the inscription engraved on the south facade, and the intriguing emergency exit door made of concrete.
项目完工照片 | Finished Photos
Maison des Arts 艺术中心-27
Maison des Arts 艺术中心-28
Maison des Arts 艺术中心-29
Maison des Arts 艺术中心-30
Maison des Arts 艺术中心-31
Maison des Arts 艺术中心-32
Maison des Arts 艺术中心-33
Maison des Arts 艺术中心-34
Maison des Arts 艺术中心-35
Maison des Arts 艺术中心-36
Maison des Arts 艺术中心-37
Maison des Arts 艺术中心-38
Maison des Arts 艺术中心-39
Maison des Arts 艺术中心-40
Maison des Arts 艺术中心-41
Maison des Arts 艺术中心-42
Maison des Arts 艺术中心-43
Maison des Arts 艺术中心-44
Maison des Arts 艺术中心-45
Maison des Arts 艺术中心-46
Maison des Arts 艺术中心-47
Maison des Arts 艺术中心-48
Maison des Arts 艺术中心-49
设计师:Tectoniques Architects
分类:Cultural Center
语言:英语
阅读原文
南京喵熊网络科技有限公司 苏ICP备18050492号-4知末 © 2018—2020 . All photos and trademark graphics are copyrighted by their owners.增值电信业务经营许可证(ICP)苏B2-20201444苏公网安备 32011302321234号