知末案例   /   公共空间   /   寺庙   /   现代寺庙

火化单元和骨灰殿

2017/04/26 13:00:00
查看完整案例
微信扫一扫
收藏
下载
翻译
The Project, in addition to solving the required brief, pretends to give order to the existing buildings through a circulation system and external pedestrians paths, with terraces and walkways which begin from the same Access to the Cemetery Park Campos de Paz.
火化单元和骨灰殿-1
火化单元和骨灰殿-2
The Project consists of two components, which are clearly identified: the Cremation Unit set in front of the existent chapel’s atrium, and the Ashes Temple, lineal building, which crosses the site longitudinally.
火化单元和骨灰殿-4
The building’s floor plan responds to the particular conditions: The Chapel and atrium’s geometry, the site’s edge with its marked topography and row of trees, and to the existing mourning chambers.
火化单元和骨灰殿-6
The volumes assume a scultoric posture where the mass predominates, achieving the image of a great sculpted block, where there is no space for ornamentation.
火化单元和骨灰殿-8
火化单元和骨灰殿-9
In its interior, the basic component of the space is light, which almost totally enters the building zenithally. To highlight the light effects opaque materials and natural texture materials where used such as yellow rock, wood and oxidized steel.
火化单元和骨灰殿-11
火化单元和骨灰殿-12
火化单元和骨灰殿-13
火化单元和骨灰殿-14
火化单元和骨灰殿-15
火化单元和骨灰殿-16
火化单元和骨灰殿-17
火化单元和骨灰殿-18
火化单元和骨灰殿-19
火化单元和骨灰殿-20
火化单元和骨灰殿-21
火化单元和骨灰殿-22
火化单元和骨灰殿-23
火化单元和骨灰殿-24
火化单元和骨灰殿-25
火化单元和骨灰殿-26
火化单元和骨灰殿-27
火化单元和骨灰殿-28
火化单元和骨灰殿-29
火化单元和骨灰殿-30
火化单元和骨灰殿-31
火化单元和骨灰殿-32
火化单元和骨灰殿-33
火化单元和骨灰殿-34
火化单元和骨灰殿-35
火化单元和骨灰殿-36
火化单元和骨灰殿-37
火化单元和骨灰殿-38
火化单元和骨灰殿-39
火化单元和骨灰殿-40
南京喵熊网络科技有限公司 苏ICP备18050492号-4知末 © 2018—2020 . All photos and trademark graphics are copyrighted by their owners.增值电信业务经营许可证(ICP)苏B2-20201444苏公网安备 32011302321234号