The first in a series of bridges on Chengdu's West Line Road, the 295-meter
West First Bridge crosses the Jiangxi River, a tributary of the Tuojiang River in China’s Sichuan province. With its 185-meter central span and 55-meter secondary spans reaching the riverbanks, the Chengdu West First Bridge is a road, cycle, and pedestrian bridge over the meandering Jiangxi River; enabling the West Line Road to become the western section of the Airport New Town ring-road and cycle route.
江西大桥丨中国四川丨扎哈·哈迪德建筑事务所-4
江西大桥丨中国四川丨扎哈·哈迪德建筑事务所-5
As arches provide the most efficient bridge structure for spans between 120-250 meters, this symmetrical bridge is composed of two primary steel arches that rise from either side of the road deck. As they rise, the arches lean together to touch tangentially at their crown, stabilizing the structure from lateral wind forces.
江西大桥丨中国四川丨扎哈·哈迪德建筑事务所-7
The dynamic curvature of the bridge’s supporting piers and abutments taper into its primary arches and road deck, defining a sculptural landmark within
’s transport infrastructure.
江西大桥丨中国四川丨扎哈·哈迪德建筑事务所-10
Commissioned to build the bridge following the 2019 design competition, Zaha Hadid Architects (ZHA) used structural analysis software on the design’s digital model. Examining all material self-weight, superimposed dead load, and traffic live loading, as well as environmental considerations of wind and temperature, this analysis ensured the structure and foundations have been designed to exceed the standards required for once-in-200-year weather events.
江西大桥丨中国四川丨扎哈·哈迪德建筑事务所-12
With a height-to-span ratio of approximately 1:6, the bridge’s arches rise to 30 meters and are tied together at their base by longitudinal box girders that run along the edge of the road deck. These ties resist the outward horizontal thrust of each arch and significantly reduce the horizontal loads on the bridge’s foundations.
江西大桥丨中国四川丨扎哈·哈迪德建筑事务所-14
江西大桥丨中国四川丨扎哈·哈迪德建筑事务所-15
Concrete abutments at either end of the bridge incorporate connectors linking the road deck to the West Line Road’s surface. With no foundations positioned in the Jiangxi River, intermediate piers are located beneath the springing points of the arches on each riverbank.
江西大桥丨中国四川丨扎哈·哈迪德建筑事务所-17
The bridge’s bored piles and abutments were constructed using conventional in-situ reinforced concrete techniques. The steel box sections of each arch were prefabricated in optimal dimensions for transportation and assembly on site. The edge box girder sections within the road deck include the cable anchorages. These sections were also prefabricated and delivered in sections to be spliced together with on-site welding.
江西大桥丨中国四川丨扎哈·哈迪德建筑事务所-19
江西大桥丨中国四川丨扎哈·哈迪德建筑事务所-20
The bridge’s prefabricated plate cross girders were delivered to the site and connected to the edge girders by a bolted cover plate splice connection. The concrete road deck has been constructed from precast panels fixed to the cross girders by in-situ concrete stitch pours.
江西大桥丨中国四川丨扎哈·哈迪德建筑事务所-22
Mobile cranes lifted all prefabricated steelwork and precast concrete elements within the bridge’s short assembly schedule. The
West First Bridge crossing the Jiangxi River will open to the public upon completion of the West Line Road.
江西大桥丨中国四川丨扎哈·哈迪德建筑事务所-25
江西大桥丨中国四川丨扎哈·哈迪德建筑事务所-26
江西大桥丨中国四川丨扎哈·哈迪德建筑事务所-27
江西大桥丨中国四川丨扎哈·哈迪德建筑事务所-28
江西大桥丨中国四川丨扎哈·哈迪德建筑事务所-29
江西大桥丨中国四川丨扎哈·哈迪德建筑事务所-30
江西大桥丨中国四川丨扎哈·哈迪德建筑事务所-31
江西大桥丨中国四川丨扎哈·哈迪德建筑事务所-32
江西大桥丨中国四川丨扎哈·哈迪德建筑事务所-33
江西大桥丨中国四川丨扎哈·哈迪德建筑事务所-34
江西大桥丨中国四川丨扎哈·哈迪德建筑事务所-35
江西大桥丨中国四川丨扎哈·哈迪德建筑事务所-36
江西大桥丨中国四川丨扎哈·哈迪德建筑事务所-37
江西大桥丨中国四川丨扎哈·哈迪德建筑事务所-38
江西大桥丨中国四川丨扎哈·哈迪德建筑事务所-39
江西大桥丨中国四川丨扎哈·哈迪德建筑事务所-40
江西大桥丨中国四川丨扎哈·哈迪德建筑事务所-41
江西大桥丨中国四川丨扎哈·哈迪德建筑事务所-42
江西大桥丨中国四川丨扎哈·哈迪德建筑事务所-43
江西大桥丨中国四川丨扎哈·哈迪德建筑事务所-44
南京喵熊网络科技有限公司 苏ICP备18050492号-4知末 © 2018—2020 . All photos and trademark graphics are copyrighted by their owners.增值电信业务经营许可证(ICP)苏B2-20201444苏公网安备 32011302321234号