知末案例   /   建筑   /   交通建筑

钢琴桥,荷兰 / NEXT architects

2018/02/17 02:00:00
查看完整案例
微信扫一扫
收藏
下载
1993年至1995年间,河畔居民层面临另人堪忧的生活处境。当时水平面极高,堤坝勉强可以控制住水位,且在未来水位会面临更加频繁的上涨。出于安全考虑,有25万居民被迫撤离。因此,政府决定在确保不造成洪涝灾害的同时,向河流释放更大水量。荷兰河流空间打造项目(Dutch Room for the River Program)便是政府应对这一问题的全国性举措。该项目的目标是给河流创造更大的空间,使其足以承受更高的水位。该项目将在全国30多个地方进行,并采取相应措施,为河流提供安全泄洪空间,同时改善临近地区的环境质量 。
The residents in the river region were confronted anxious times in 1993 and 1995. The water levels were extremely high and the dikes just managed to hold. A quarter of a million people had to be evacuated. Extremely high river discharges will occur more frequently in the future and for this reason it was decided to ensure that the rivers could discharge the forecast greater volumes of water without flooding. In response, a National wide project has started, the Dutch Room for the River Program. The goal of the program is to give the river more room to be able to manage higher water levels. At more than 30 locations, measures will be taken that give the river space to flood safely. Moreover, the measures will be designed in such a way that they improve the quality of the immediate surroundings.
▼区位图,site map © NEXT architects
钢琴桥,荷兰 / NEXT architects-3
▼通过开凿支流营造出一座崭新岛屿,并用钢琴桥将其两岸相连,by creating a bypass for the river a new island emerges and with the bridge connects the island and the northern riverbank ©NEXT architects, Zaligebrug, Photography Jan Daanen
钢琴桥,荷兰 / NEXT architects-5
▼©NEXT architects, Zaligebrug, Photography Rutger Hollander
钢琴桥,荷兰 / NEXT architects-7
Citadel桥俗称 “钢琴桥”,位于奈梅亨,属于瓦尔河空间打造国家级项目的一部分。该工程通过开凿一条瓦尔河支流,营造出一座崭新岛屿,Veur-Lent岛。桥梁长达700英尺,连接Veur-Lent岛和北面河堤。因其位于河滩之上,所以一年之中总会有几天大桥会部分淹没于水中。水位上下平均波动约为5米。钢琴桥在设计中巧妙地利用了河流水位涨落这一特殊性。
The Citadel Bridge in Nijmegen is part of Room for the Waal River as part of the national program. By creating a bypass for the river, the Waal, a new island, Veur-Lent, emerges. With a length of 700 feet the bridge connects the island and the northern riverbank. Its location, in the floodplain, makes the bridge partially submerge in the water a few days a year, with an average fluctuation of about 5 meters. This particular characteristic was used as one of the main design principles for the bridge.
▼钢琴桥,the citadel bridge ©NEXT architects, Zaligebrug, Photography Jennie Burgers
钢琴桥,荷兰 / NEXT architects-11
钢琴桥,荷兰 / NEXT architects-12
▼©NEXT architects, Zaligebrug, Photography Rutger Hollander
钢琴桥,荷兰 / NEXT architects-14
在城市水系公园里,21世纪初提出的水安全空间质量构想将得以变为现实。在这里,人们可以体验水的流动性。城市水系公园将向世人展示:动态水是打造令人兴奋和愉悦新景观背后的驱动力。河流动力学是水利基础,它被转换为公园内步道系统学。
In the Urban River Park, the spatial quality of the water safety thinking at the beginning of the 21st century will be made visible. To experience the water dynamics is a major opportunity. The Urban River Park is a park that shows that river dynamics is the driving force behind an exciting and enjoyable new landscape. The fluvial dynamics are the basis of a water calendar, which is translated into a typology of the trail system in the park.
▼享受亲水乐趣,enjoying the life with water ©NEXT architects, Zaligebrug, Photography Jeroen Bosch
钢琴桥,荷兰 / NEXT architects-18
钢琴桥,荷兰 / NEXT architects-19
▼© NEXT architects, Zaligebrug, Photography Rutger Hollander
钢琴桥,荷兰 / NEXT architects-21
▼©NEXT architects, Zaligebrug, Photography Jeroen Bosch
钢琴桥,荷兰 / NEXT architects-23
弧形钢琴桥是步道不可或缺的一部分。退潮时节,桥体处于陆地之上;但随着水位升高,步道与桥梁逐渐淹没于水下。桥梁与道路之间的过渡是平稳、渐进的。而纵向剖面采用不对称设计,涨潮时节仅桥梁下部淹没消失。如此一来,景观动态性跃然呈现。水位上升使桥梁上部好似漂浮于水面,形成一道迷人景致。水位回降,踏脚石也可用作长凳,赋予了大桥娱乐气质。
The curved Citadel Bridge becomes an integral part of this path. At low tide, the bridge deck rests on land, but with rising waters the path and bridge submerge. The transition between bridge and path is smooth and gradual, and the longitudinal profile is asymmetrical, making only the lower part of the bridge disappear at high tide. Then the dynamics of the landscape are most visible, and the rising water becomes an attraction, as the high part of the bridge appears to float. Stepping stones also can be used as benches that enhance the recreational quality of the bridge.
▼随水位升高桥若隐若现于河水中,At low tide, the bridge deck rests on land, but with rising waters the path and bridge submerge © NEXT architects, Zaligebrug, Photography Jan Daanen
钢琴桥,荷兰 / NEXT architects-27
▼©NEXT architects, Zaligebrug, Photography Rutger Hollander
钢琴桥,荷兰 / NEXT architects-29
钢琴桥,荷兰 / NEXT architects-30
大桥始建于2014年4月,预算为500万美元。2015年秋季完工。河流空间打造 (Room for the River)是两项欧盟合作项目,由INTERREG IVB NWE 项目提供资助。这两项欧盟项目分别是城市防项目洪(Flood Resilient City,FRC)及防洪土地合理利用(ALFA)项目。
The construction of the bridge started in April 2014 and has a budget of $ 5 million building cost. Completion is scheduled for autumn 2015. Room for the River is lead partner for two EU projects, subsidized in the INTERREG IVB NWE program. These are Flood Resilience City (FRC) and Adaptive Land Use for Flood Alleviation (ALFA).
▼桥身横切面,long section © NEXT architects
钢琴桥,荷兰 / NEXT architects-34
▼桥身纵切面,short section © NEXT architects
钢琴桥,荷兰 / NEXT architects-36
项目名称:钢琴桥(Citadel bridge) 项目编号:1107 类型/计划/目的:桥 位置:奈梅亨(荷兰)Nijmegen ,The Netherlands 跨度:210 mtr 状态:建成 初期设计: 2011年11月 最终设计: 2012年12月 开始建造: 2014年4月 完成: 2015年 业主:奈梅亨市政府(Municipality of Nijmegen) 设计师: NEXT建筑事务所 顾问 结构顾问:IBA Amsterdam (ing . Chris Hattink) 承包人: I-Lent (Dura Vermeer Divisie Infra BV en Ploegam BV) 版权所有:NEXT architects
钢琴桥,荷兰 / NEXT architects-38
钢琴桥,荷兰 / NEXT architects-39
钢琴桥,荷兰 / NEXT architects-40
钢琴桥,荷兰 / NEXT architects-41
钢琴桥,荷兰 / NEXT architects-42
钢琴桥,荷兰 / NEXT architects-43
钢琴桥,荷兰 / NEXT architects-44
钢琴桥,荷兰 / NEXT architects-45
钢琴桥,荷兰 / NEXT architects-46
南京喵熊网络科技有限公司 苏ICP备18050492号-4知末 © 2018—2020 . All photos and trademark graphics are copyrighted by their owners.增值电信业务经营许可证(ICP)苏B2-20201444苏公网安备 32011302321234号