知末案例   /   酒店民宿   /   酒店   /   Persian Garden Studio

汉娜项目

2019/08/03 03:00:00
查看完整案例
微信扫一扫
收藏
下载
翻译
Around 90-years ago, six buildings were constructed in the center of Tehran, creating its one and only symmetrical street. These remaining structures on Lolagar Alley are some of the best examples of architecture from the First Pahlavi era, a time when modern architecture was beginning to appear in Tehran. Initially all six of these buildings were residential, but over time, like many other buildings in downtown Tehran, they were left unoccupied. Hanna Project, which includes a hotel, restaurant, gallery, and multipurpose spaces, was designed in one of these buildings, with the intention of bringing life back to Lolagar Alley and Tehran’s city center.
汉娜项目-1
汉娜项目-2
汉娜项目-3
Part of the design intention was to reconnect the building to Lolagar Alley, but this time with more occupants. As such, new layers were designed around the building and in deference to the original structure, it invite users to move around and inside this historic building.
汉娜项目-5
汉娜项目-6
汉娜项目-7
汉娜项目-8
汉娜项目-9
汉娜项目-10
The new volumes create the project’s garden, recessed courtyard, part of the restaurant, and gallery. These new layers also seep inside the original building, bringing new functions inside, while maintaining its original layers and structure. An added neutral volume on the east elevation is used to house the hotel bathrooms, and rises to the roof to create the hotel’s multi-purpose space. This space provides a panoramic view of the surrounding areas, while remaining hidden from street level. In the extensions construction metal frames were added to reduce the boundary between inside and outside. These frames define the gallery entrance, and make the border between the gallery and Lolagar Alley transparent. These frames are also used on the building’s façade to provide more light and views to the hotel guests.
汉娜项目-12
汉娜项目-13
汉娜项目-14
Because the building was left unoccupied over the years, there was much damage to its structure, which made its structural reinforcement quite complex. Concrete walls and continuous concrete slabs, columns, and metal trusses were added to reinforce the existing structure.
汉娜项目-16
The concrete slabs serve a structural purpose and are also the finished interior flooring material. Shear walls and metal structures are also left exposed to familiarize the building’s visitors with its renovation process.
汉娜项目-18
Hanna project attempted to return people to the center of Tehran, and reacquaint them with abandoned buildings. New added layers that are a product of their time, help the building accommodate users now and in the future, while also displaying the glory of its historic architecture.
汉娜项目-20
汉娜项目-21
汉娜项目-22
汉娜项目-23
汉娜项目-24
汉娜项目-25
汉娜项目-26
汉娜项目-27
汉娜项目-28
汉娜项目-29
汉娜项目-30
汉娜项目-31
汉娜项目-32
汉娜项目-33
汉娜项目-34
汉娜项目-35
汉娜项目-36
汉娜项目-37
汉娜项目-38
汉娜项目-39
汉娜项目-40
汉娜项目-41
汉娜项目-42
汉娜项目-43
汉娜项目-44
汉娜项目-45
汉娜项目-46
汉娜项目-47
汉娜项目-48
汉娜项目-49
汉娜项目-50
汉娜项目-51
汉娜项目-52
汉娜项目-53
汉娜项目-54
汉娜项目-55
汉娜项目-56
汉娜项目-57
汉娜项目-58
汉娜项目-59
汉娜项目-60
汉娜项目-61
汉娜项目-62
汉娜项目-63
汉娜项目-64
汉娜项目-65
汉娜项目-66
汉娜项目-67
南京喵熊网络科技有限公司 苏ICP备18050492号-4知末 © 2018—2020 . All photos and trademark graphics are copyrighted by their owners.增值电信业务经营许可证(ICP)苏B2-20201444苏公网安备 32011302321234号