知末案例   /   公共空间   /   图书馆   /   现代图书馆

Monteiro Lobato 图书馆翻新设计

2019/08/13 20:00:00
查看完整案例
微信扫一扫
收藏
下载
翻译
The building of the Monteiro Lobato Library was originally designed for the headquarters of the Brazilian Post and Telegraph Company.
Monteiro Lobato 图书馆翻新设计-1
The goal of the renovation project is to value the public facility so that it stands out in the city's dynamics. In general, interventions should recover the environmental conditions of the building, the square, and its surroundings; update the electro-electronic, hydraulic and air conditioning installation systems with better performance solutions for consumption; and ensure comfort and safety conditions for users and the archive.
Monteiro Lobato 图书馆翻新设计-3
The conditions and uses of the square's surroundings were examined to strengthen the potential of the urban context in which the Library is located.
Monteiro Lobato 图书馆翻新设计-5
Monteiro Lobato 图书馆翻新设计-6
Monteiro Lobato 图书馆翻新设计-7
On the ground floor, there shall be an open library, that is, direct public access to the general collection: after going through the entrance control, the visitor shall be free to access the books and handle them at the tables arranged throughout the room.
Monteiro Lobato 图书馆翻新设计-9
All masonry walls and non-structural elements will be demolished to form a single room filled with low and curvilinear bookshelves.
Monteiro Lobato 图书馆翻新设计-11
The entire facade will be assembled in fixed glass panels, with openings only on the upper part of the frame. A screen panel will be placed close to the glass for both mechanical and sun protection ( like a brise soleil). This way, avoiding the installation of fences around the perimeter of the lot, opening the library gardens to the city.
Monteiro Lobato 图书馆翻新设计-13
Also on the ground floor, an extension of the library will be built, as an attachment, in a concrete structure. In this new space, there will be a multipurpose room and a café, which may be accessed independently of the library's opening hours.
Monteiro Lobato 图书馆翻新设计-15
The second floor of the pre-existing building will be reserved for more private activities, such as administration, access to the rarer books and the Braille rooms.
Monteiro Lobato 图书馆翻新设计-17
Monteiro Lobato 图书馆翻新设计-18
Monteiro Lobato 图书馆翻新设计-19
Monteiro Lobato 图书馆翻新设计-20
Monteiro Lobato 图书馆翻新设计-21
Monteiro Lobato 图书馆翻新设计-22
Monteiro Lobato 图书馆翻新设计-23
Monteiro Lobato 图书馆翻新设计-24
Monteiro Lobato 图书馆翻新设计-25
Monteiro Lobato 图书馆翻新设计-26
Monteiro Lobato 图书馆翻新设计-27
Monteiro Lobato 图书馆翻新设计-28
Monteiro Lobato 图书馆翻新设计-29
Monteiro Lobato 图书馆翻新设计-30
Monteiro Lobato 图书馆翻新设计-31
Monteiro Lobato 图书馆翻新设计-32
Monteiro Lobato 图书馆翻新设计-33
Monteiro Lobato 图书馆翻新设计-34
Monteiro Lobato 图书馆翻新设计-35
Monteiro Lobato 图书馆翻新设计-36
Monteiro Lobato 图书馆翻新设计-37
南京喵熊网络科技有限公司 苏ICP备18050492号-4知末 © 2018—2020 . All photos and trademark graphics are copyrighted by their owners.增值电信业务经营许可证(ICP)苏B2-20201444苏公网安备 32011302321234号