知末案例   /   建筑   /   文化建筑

Coca-Cola Stage at the Alliance Theatre / Trahan Architects

2020/01/23 01:00:00
查看完整案例
微信扫一扫
收藏
下载
翻译
Architects:Trahan Architects
Area:70000ft²
Year:2019
Photographs:Greg Mooney,James Babin
Manufacturers:CW Keller
Lead Architects:Trey Trahan, Leigh Breslau, Brad McWhirter
Lighting Designer:Fisher Marantz Stone
Structural Engineer:Uzun + Case
Electrical Engineer:DLB Associates Consulting Engineers
Mechanical Engineer:DLB Associates Consulting Engineers
General Contractor:Hogan Construction Group
Project Management:Cost Plus
Design Team:Robbie Eleazer, Scott Melançon, Ayesha Husain, Conway Pedron, Sarah Hussaini, James Babin
Theater Consultants:Theatre Projects
Acoustics:Talaske
Plumbing Engineer:DLB Associates Consulting Engineers
Graphic Design:Thirst
Life Safety:Jensen Hughes
Vertical Transportation:Lerch Bates
Clients:Chuck Winstead
Cost Management:Cost Plus
City:Atlanta
Country:United States
Coca-Cola Stage at the Alliance Theatre / Trahan Architects-23
Text description provided by the architects. The Alliance Theatre, founded in 1968, is a Tony award-winning regional theatre located within the celebrated Woodruff Arts Center campus. The initial phase of work focused on the chamber, its lobby and artistic support facilities which were gutted to the original concrete enclosing walls. The transformation pulled the 650 seat chamber 10’ closer to stage. The planning of the chamber optimized site lines, utilized ramping in lieu of lifts and integrated stairs to provide access to all levels. Each surface was tuned acoustically to deliver world class theatre to its patrons.
Coca-Cola Stage at the Alliance Theatre / Trahan Architects-25
The design team felt a responsibility to remove the separation between balcony and orchestra – challenging historic notions of segregation and discrimination. All seating zones can be accessed from every entrance within the chamber – a unifying planning feature of the Alliance Theatre Transformation.
Coca-Cola Stage at the Alliance Theatre / Trahan Architects-27
Coca-Cola Stage at the Alliance Theatre / Trahan Architects-28
The Firm assembled a world class team to implement handcrafted steam bending techniques and artistry on an architectural scale. From concept to construction the project demonstrates innovation through collaboration between Artist, Architect, & Fabricator. The result is a series of beautiful steam bent millwork guardrails and balconies that merge hand craft with mass production. The synthesis of acoustic performance, hand driven artistry, and sophisticated laser positioning are all carefully choregraphed to execute the complex steam bent millwork without the need for wasteful CNC molds. Delivered for $330/sf, the product has proven to be both economical and stunning.
Project gallery
Coca-Cola Stage at the Alliance Theatre / Trahan Architects-31
Coca-Cola Stage at the Alliance Theatre / Trahan Architects-32
Coca-Cola Stage at the Alliance Theatre / Trahan Architects-33
Coca-Cola Stage at the Alliance Theatre / Trahan Architects-34
Coca-Cola Stage at the Alliance Theatre / Trahan Architects-35
Coca-Cola Stage at the Alliance Theatre / Trahan Architects-36
Coca-Cola Stage at the Alliance Theatre / Trahan Architects-37
Coca-Cola Stage at the Alliance Theatre / Trahan Architects-38
Coca-Cola Stage at the Alliance Theatre / Trahan Architects-39
Coca-Cola Stage at the Alliance Theatre / Trahan Architects-40
Project location
Address:Atlanta, Georgia, United States
南京喵熊网络科技有限公司 苏ICP备18050492号-4知末 © 2018—2020 . All photos and trademark graphics are copyrighted by their owners.增值电信业务经营许可证(ICP)苏B2-20201444苏公网安备 32011302321234号