知末
知末
创作上传
VIP
收藏下载
登录 | 注册有礼

Versus Installation / TITAN

2018/03/19 08:15:18
查看完整案例
微信扫一扫
收藏
下载
翻译
Architects:TITAN
Year:2021
Photographs:Julien Lanoo
Versus Installation  / TITAN-3
Text description provided by the architects. The new installation designed by TITAN is inspired by the relationship between form and balance established by architect Mathurin Crucy, who designed both the square and the theater in the late 18th century. Featuring a roller skating rink, this temporary structure has been adapted to the irregularities of the ground and plays with its natural slope, giving the square a renewed sense of centrality, and opening it up to hours of fancy-free skating. Measuring 38m in diameter, the main structure is made of prefabricated white concrete, while the rink track is poured-in-place white concrete.
Versus Installation  / TITAN-5
Versus Installation  / TITAN-6
Amblers and athletes alike can meet on the track inside the rink, which offers an opportunity to honour a lively and effervescent sport that has made a comeback in recent years: Roller derby. Spectators can sit on the steps of the theatre – conveniently turned into bleachers – for an open-air match.
Versus Installation  / TITAN-8
The public can also sit at the edge of the installation, where benches invite everyone to contemplate and discover Place Graslin in this new light. The concept explores the relationship between the balanced proportions of the historic fabric, the divergent views, and the city’s social dynamics, providing inhabitants and festival visitors with a new open public space.
Versus Installation  / TITAN-10
Versus Installation  / TITAN-11
VERSUS is open to the public as part of the art festival Le Voyage à Nantes until the end of September 2021 and also includes a service loaning out roller skates and rollerblades.
Versus Installation  / TITAN-13
Project gallery
Versus Installation  / TITAN-15
Versus Installation  / TITAN-16
Versus Installation  / TITAN-17
Versus Installation  / TITAN-18
Versus Installation  / TITAN-19
Versus Installation  / TITAN-20
Versus Installation  / TITAN-21
Versus Installation  / TITAN-22
Versus Installation  / TITAN-23
Versus Installation  / TITAN-24
Versus Installation  / TITAN-25
Project location
Address:Pl. Graslin, 44000 Nantes, France
南京喵熊网络科技有限公司 苏ICP备18050492号-4知末 © 2018—2020 . All photos and trademark graphics are copyrighted by their owners.增值电信业务经营许可证(ICP)苏B2-20201444苏公网安备 32011302321234号
客服
消息
收藏
下载
最近