知末
知末
创作上传
VIP
收藏下载
登录 | 注册有礼

BRT 车站

2022/11/27 23:32:17
查看完整案例
微信扫一扫
收藏
下载
翻译
Firm: Gustavo Penna Arquiteto & Associados
Type: Transport + Infrastructure › Bus
STATUS: Built
YEAR: 2014
SIZE: 10,000 sqft - 25,000 sqft
BUDGET: $10M - 50M
Photos: Jomar Braganca (9)
Contemporaneity and functionality — both harmonically matching the urban landscape — were the guidelines for the project of the BRT (Bus Rapid Transit) stations.
The shape of the “modules” aims to blend itself with the dynamic landscape. The notion of “just one bus more” was the way elected in order to avoid the multiplication of visual stimuli of the urban scenery.
The modular stations, conceived in metallic structures, arrive at the construction site already pre-built, which allows for swiftness in deployment and quality of the final product. The finishing in ACM (Aluminum Composite Material) is yet another component that brings efficiency to the project, and it can be replicated in other parts of the city and even in other regions of the country.
Access control to the station is made possible by the use of turnstiles, and is also designed having in mind disabled users. The BRT system also offers comfort, considering it makes use of glass and perforated plates to enclose the sides and thus allows for better visibility, lighting and natural ventilation.
The equipment also covers the needs for sustainability and accessibility, currently so dear to the population. Economical both in deployment and maintenance, it has a system that allows for better use of internal ventilation and lighting, while also being fully accessible, welcoming cyclists and promoting integration with other urban means of transportation.
BRT 车站-12
BRT 车站-13
BRT 车站-14
BRT 车站-15
BRT 车站-16
BRT 车站-17
BRT 车站-18
BRT 车站-19
BRT 车站-20
BRT 车站-21
BRT 车站-22
BRT 车站-23
BRT 车站-24
BRT 车站-25
南京喵熊网络科技有限公司 苏ICP备18050492号-4知末 © 2018—2020 . All photos and trademark graphics are copyrighted by their owners.增值电信业务经营许可证(ICP)苏B2-20201444苏公网安备 32011302321234号
客服
消息
收藏
下载
最近