查看完整案例
收藏
下载
翻译
Architects:Galmstrup Architects
Area:1100m²
Year:2023
Photographs:Nick Kane
Manufacturers:Duravit,Envirograf,Forbo,Glulam Solutions,John Dennis & Company,ROCKWOOL,Rationel,Russwood,VMZINC
Quantity Surveyor:CBA
Main Contractor:John Dennis Ltd
Architect:Galmstrup Architects
Principal Designer:James F. Stephen Architects
Client:Eyemouth Harbour Trust
Structural And Mep Engineer:Arup
Contract Administrator:James F Stephens Architects
Steelwork Contractor:G. Fitzsimmons and Son Ltd
Clients' view: The Eyemouth Waterfront Regeneration project is an integral part of our overarching purpose. The innovative redevelopment of what is locally known as the ‘old fishmarket’ site aims to create a place that can help achieve sustainable economic growth in Eyemouth, be welcoming and pleasant for visitors and residents alike, and restore the sense of identity to the waterfront area of Eyemouth. | Client: Donald Duggan - Chairman Eyemouth Harbour Trust | From the outset, we were blown away by the high level of commitment, professionalism, and enthusiasm of the project team led by Galmstrup Architects. It has been a fascinating journey where challenges were met positively. Galmstrup Architects took the time to understand the brief fully and how the development would sit within the town, and not just the harbor’s immediate vicinity. The team ensured this was fully incorporated into the design and construction delivering a stunning, high-quality building, offering maximum flexibility for a variety of uses and delivering a unique waterfront space all year round. The harbor pavilion is already proving a popular space in town, and we fully expect it will be a catalyst for further waterfront regeneration. I can’t wait to see the buzz it creates as we come into spring and summer when it will be in full use. | Client: Christine Bell - CEO Eyemouth Harbour Trust |
Project location
Address:Eyemouth, United Kingdom