Architect:dkarchitekti, s.r.o.
Location:Hlinky, 603 00 Brno-střed-Pisárky, Czechia; | ;View Map
Project Year:2020
Category:Train stations;Tram Stops
Brno Public Transport Company
Czech Republic, Brno-Pisárky, Hlinky Street
DKARCHITEKTI (David Kudla, Tomáš Fries, Filip Malý)
117 × 14.5 m, height 10.5 m,
5.6 × 23.6 m
1,612 sqm
6,650 sqm
12,730 sqm
2017
2018–2020
A new tram maintenance depot was built in Brno-Pisárky. The architects DKARCHITEKTI gave the building a highly distinctive look and also the technical solution is very unique – it goes beyond what we imagine under the terms "hall" or "depot". The distinctive facade panel segmentation was optimised for noise dampening and the large-format window opens up the premises of the Brno Public Transport Company to the public. Even the six-meter entry and exit gate, which matches the size of the tram, is a smart solution.
The prism-shaped building is 117 m long, including facade, and allows trams to pass through the whole building. Its facade is dispersing noise from trams riding on the adjacent track. There is only a single window with a size of 23.6 x 5.6 m, consisting of 24 glass segments supported by the spider system. The window cuts through the aluminium panel facade and shows the result of the working process: a cleaned and well-maintained tram. As tram maintenance is carried out until late at night, this window will tell a story about trams being made ready for tomorrow while other people have ended their working day.
The inner layout is open and adjusted to tram sizes and maintenance demands. There are two through-tracks inside the depot, designated for vehicle cleaning and maintenance. A red box is situated by the exit at the large window for staff backrooms and the command centre, controlling vehicle arrivals in the depot, the technological process and trams parking on the tracks.
The entry portal and exit portal create a roofed space with a red aluminium cladding and folding power gates, perfectly integrated into the joints pattern of the cladding. The depot deserved more than a standard solution for these large gates, which is why this original solution (including the power drive) was developed. And what is the result? A portal without obvious voids having the size of a tram. The dimensions of the entry gate and exit gate are 5.2 x 5.8 m and 5.8 x 5.8 m, respectively.
Even though the tram maintenance depot is, by nature, a utility structure which must be practical and functional, we managed to achieve high aesthetic quality as well. We therefore give meaning to the term "industrial architecture".
▼项目更多图片
Hall of daily treatment DEPO Brno-20
Hall of daily treatment DEPO Brno-21
Hall of daily treatment DEPO Brno-22
Hall of daily treatment DEPO Brno-23
Hall of daily treatment DEPO Brno-24
Hall of daily treatment DEPO Brno-25
Hall of daily treatment DEPO Brno-26
Hall of daily treatment DEPO Brno-27
Hall of daily treatment DEPO Brno-28
Hall of daily treatment DEPO Brno-29
Hall of daily treatment DEPO Brno-30
Hall of daily treatment DEPO Brno-31
Hall of daily treatment DEPO Brno-32
Hall of daily treatment DEPO Brno-33
Hall of daily treatment DEPO Brno-34
Hall of daily treatment DEPO Brno-35
Hall of daily treatment DEPO Brno-36
Hall of daily treatment DEPO Brno-37
Hall of daily treatment DEPO Brno-38
Hall of daily treatment DEPO Brno-39
Hall of daily treatment DEPO Brno-40
Hall of daily treatment DEPO Brno-41
Hall of daily treatment DEPO Brno-42
Hall of daily treatment DEPO Brno-43
Hall of daily treatment DEPO Brno-44
Hall of daily treatment DEPO Brno-45
Hall of daily treatment DEPO Brno-46
Hall of daily treatment DEPO Brno-47
Hall of daily treatment DEPO Brno-48
Hall of daily treatment DEPO Brno-49
南京喵熊网络科技有限公司 苏ICP备18050492号-4知末 © 2018—2020 . All photos and trademark graphics are copyrighted by their owners.增值电信业务经营许可证(ICP)苏B2-20201444苏公网安备 32011302321234号