位于中央公园中心的卡尔顿啤酒厂联合体(Carlton & United Brewery Yard),以其强大的适应性展示了Tzannes事务所对可持续性、创新性,以及跨学科合作的重视。本项目是场地上保留的最大的一组遗产建筑,直到2005年,该建筑一直是啤酒厂最具代表性的名片。
The adaptive reuse of the Carlton and United Brewery Yard, located in the centre of Central Park, demonstrates the importance Tzannes places on sustainability, innovation and collaboration. It is the largest group of retained heritage buildings on site and will provide the most direct representation of the brewery which existed on the site until 2005.
▼项目概览,overall view © John Gollings
改造的第一阶段于2015年完成,重点是场地中三联电站的整合。与其将三联电站封闭在一个建筑体量内,建筑师决定在其顶部增添一个优雅且富有表现力的新元素。该元素的形式源于与现有屋顶线复杂轮廓的整合,使这座工厂必须的基础设施以一种更有机的几何形式呈现出来。
Stage 1 of the development completed in 2015, focused on the integration of a trigeneration plant. Rather than enclosing the trigeneration plant in the building, an expressive and elegant new element was created on top. The form was derived from the integration with the complex profile of the existing roofline to a more organic geometric form of the plant equipment required at roof level.
▼场地鸟瞰,aerial view of the site © John Gollings
▼建筑外观,exterior view of the building © John Gollings
▼标志性的烟囱与屋顶新元素,
the iconic chimney and new roof elements © John Gollings
▼近景,closer view © John Gollings
该项目展示了一种高效且先进的发电技术,以燃气发电的形式向周边地区提供了能源,包括满足厂区对于热水和冷水的需求等。该项目在遗产背景下设计,实现了显著的社区效益,并为该地区创造了新的地标。
The development demonstrates how a highly efficient and progressive power generation technology, can deliver gas-generated electricity, including hot and cold water to the surrounding precinct. Designed within a heritage context, this development achieves significant community benefits, as well as creating a new landmark for the precinct.
▼屋顶栈道,passage on the roof © John Gollings
▼屋顶新元素,the new roof element © John Gollings
▼细部,details © John Gollings
三联产能源供应的模式旨在让电厂在25年的生命周期内减少约18万吨的碳排放。在与Icon Construction、IP Generation和Johnstaff的紧密合作下,Tzannes Architect设计并交付了啤酒厂的最后阶段,该啤酒厂将于2024年接近完工,中央公园的最初目标正在实现,啤酒厂将被重新利用,作为该地区公共公园和城市广场的锚点。
The trigeneration energy supply is modelled to reduce carbon emissions by an estimated 180,000 tonnes over the 25-year life of the plant. Working with Icon Construction, IP Generation, and Johnstaff to design and deliver the final stage of the Brewery Yard nearing completion in 2024, the original goal of Central Park is being realised with the Brewery Yard repurposed to serve as the anchor to the public park and urban square for the precinct.
▼室内视角,interior views © John Gollings
▼总平面图,master plan © Tzannes
▼立面图,elevation © Tzannes
▼剖面图,section © Tzannes
Completion date 2024
Project team
Tzannes Architect
Frasers Property Australia Developer (Stage 1)
Sekisui House Australia Developer (Stage 1)
Meinhardt Structural/Facade (Stage 1)
Total Constructions Builder (Trigen Plant Equipment) (Stage 1)
WSP Group Electrical/Hydraulic/Mechanical/Fire/Environmental (Stage 1)
Webb Australia Lighting (Stage 1)
Acoustic Logic Acoustic (Stage 1)
Altus Page Kirkland Cost Consultant (Stage 1)
Accessibility Solutions Access (Stage 1)
City Plan Services BCA (Stage 1)
Degotardi Smith & Partners Surveyor (Stage 1)
Urbis Heritage/Conservation (Stage 1&2)
JBA Urban Planning Planner (Stage 1)
IP Generation Owner (Stage 2)
ICON Construction Contractor (Stage 2)
Johnstaff Project Manager (Stage 2)
Ethos Urban Planner (Stage 2)
Stantec Structural (Stage 2)