知末
知末
创作上传
VIP
收藏下载
登录 | 注册有礼

丨RDLR Architects

2025/04/22 04:47:59
查看完整案例
微信扫一扫
收藏
下载
翻译
Firm: RDLR Architects
Type: Transport + Infrastructure › Bus
STATUS: Built
YEAR: 2021
SIZE: 25,000 sqft - 100,000 sqft
The Fort Bend County Public Transit Administration and Maintenance Facility includes an administration building and a bus maintenance building in Rosenberg with a fuel island and bus wash facility. The RDLR team designed an economical, efficient project that portrays a rural architecture character. A pre-engineered structure was used to reduce the project costs, and the team worked closely with the county to use cost effective low maintenance materials throughout the project. The design involved specialized equipment coordination throughout the facility.
丨RDLR Architects-6
丨RDLR Architects-7
丨RDLR Architects-8
丨RDLR Architects-9
丨RDLR Architects-10
丨RDLR Architects-11
南京喵熊网络科技有限公司 苏ICP备18050492号-4知末 © 2018—2020 . All photos and trademark graphics are copyrighted by their owners.增值电信业务经营许可证(ICP)苏B2-20201444苏公网安备 32011302321234号
客服
消息
收藏
下载
最近