知末
知末
创作上传
VIP
收藏下载
登录 | 注册有礼

丨美国俄勒冈丨未明确提及,可能与Arcadis有关

2022/03/20 00:00:00
查看完整案例
微信扫一扫
收藏
下载
丨美国俄勒冈丨未明确提及,可能与Arcadis有关-0
Abraham N. Rodríguez Guzmán
Portland
丨美国俄勒冈丨未明确提及,可能与Arcadis有关-3
New Athey Creek Middle School
This brand-new middle school sits on a sloping site overlooking the Tualatin River. Deliberately nestled into the hillside to preserve existing views from the adjoining neighborhood, the building is being fashioned from timeless materials that relate to the natural context and a nearby historic homestead site. The main facades will be created using pre-cast concrete panels to reduce waste, increase energy efficiency, and improve installation time. The building will contain a double-sided stage to allow performance to occur in either the gymnasium or student commons, allowing the flexibility needed for a school with a thriving performing arts program.
Learning neighborhoods are arranged around a central double-height library, with access to the external learning courtyard and a view of the river beyond. Each neighborhood has five general classrooms, one science classroom, one small group room, and restrooms arranged around an ‘L’ shaped porch that provides both visual supervision and a sense of separation for small groups of students.
Status:
Under Construction
Location:
West Linn, OR, US
My Role:
Design Development, Construction Documents
Additional Credits:
Work done while at Arcadis. The project team included Jonathan Steel, Jim Fitzpatrick, Rebecca Grant, Rebecca Stuecker, Robert Musial, and Marta Lilly.
丨美国俄勒冈丨未明确提及,可能与Arcadis有关-15
丨美国俄勒冈丨未明确提及,可能与Arcadis有关-16
丨美国俄勒冈丨未明确提及,可能与Arcadis有关-17
丨美国俄勒冈丨未明确提及,可能与Arcadis有关-18
南京喵熊网络科技有限公司 苏ICP备18050492号-4知末 © 2018—2020 . All photos and trademark graphics are copyrighted by their owners.增值电信业务经营许可证(ICP)苏B2-20201444苏公网安备 32011302321234号
客服
消息
收藏
下载
最近