知末
知末
创作上传
VIP
收藏下载
登录 | 注册有礼

丨韩国丨Heike Mutter & Ulrich Genth

2022/05/02 00:00:00
查看完整案例
微信扫一扫
收藏
下载
Spacewalk
Pohang, KR
Client
THE TON
Architecture
Design-to-Production
Architecture (Design)
Heike Mutter & Ulrich Genth
Collaboration
Design-to-Production
Scope
Parameter study, structural analysis, detail design
Materials
Steel
Height
28 m
Span
13 m
丨韩国丨Heike Mutter & Ulrich Genth-18
The geometry of the artificial staircase, which resembles a roller coaster with accessible heights of up to 28 m above ground, was optimized with the aid of parametric studies with variable support positions and the aim of achieving the most favorable eigenfrequency possible.
丨韩国丨Heike Mutter & Ulrich Genth-20
The construction with a total length of 330 m - of which approx. 300 m can be walked on - has a double curved shape and consists of a main round hollow profile, to which the individual stair treads and railings are attached. Due to the exposed location near the coast, increased attention was paid to the transfer of the high wind loads.
丨韩国丨Heike Mutter & Ulrich Genth-22
丨韩国丨Heike Mutter & Ulrich Genth-23
丨韩国丨Heike Mutter & Ulrich Genth-24
丨韩国丨Heike Mutter & Ulrich Genth-25
南京喵熊网络科技有限公司 苏ICP备18050492号-4知末 © 2018—2020 . All photos and trademark graphics are copyrighted by their owners.增值电信业务经营许可证(ICP)苏B2-20201444苏公网安备 32011302321234号
客服
消息
收藏
下载
最近