知末
知末
创作上传
VIP
收藏下载
登录 | 注册有礼
知末案例   /   教育空间   /   大学

丨Omrania

2024/02/04 00:00:00
查看完整案例
微信扫一扫
收藏
下载
丨Omrania-0
丨Omrania-1
丨Omrania-2
丨Omrania-3
丨Omrania-4
丨Omrania-5
4 Colleges at Taiba University Photo © Omrania
4 Colleges at Taiba University Photo © Omrania
4 Colleges at Taiba University Photo © Omrania
4 Colleges at Taiba University Photo © Omrania
4 Colleges at Taiba University Photo © Omrania
4 Colleges at Taiba University Photo © Omrania
4 Colleges at Taiba University New & astonishing learning environments
Project Brief
Four amazing new colleges for the University of Taibah in Al-Madinah Al-Munawara. These Colleges are:
1- College of Engineering
Site Area 37,200m2 The estimated no. of students is 3000, with an approximate built up area of 45,000m2.
2- College of Dentistry: ( 2 colleges, male and female): Site Area: Males 47,500m2 – Females 40,780m2 The estimated no. of students is 480 each, with an approximate built up area of 13,440m2 each. This includes Dental Out-Patient Clinics, with an approximate built-up area of 6,000 m2.
3- College of Pharmacy: ( 2 colleges, male and female) Site Area: Males 25,460m3 – Females 20,410m2, The estimated no. of students is 500 each, with an approximate built up area of 11,000m2 each.
4- College of Applied Medical Sciences: ( 2 colleges, male and Female) Site Area: Male 25,810m2 – Female 13,460m2 The estimated no. of students is 1000 each, with an approximate built up area of 20,000m2 each.
Project Info
Client: Ministry of Higher Education
Location: Tayba, Al-Madinah Al-Munawara, KSA
Construction value: SR 500,000,000
Total area: Site 210,620 sqm - BUA 140,000 sqm
Year Completed: 2019
Status: Design Completed
Project Credits
Architecture : Omrania
Interiors : Omrania
Landscape : Omrania
SMEP Engineering : Omrania
Medical Planning : UHS
Project Location
南京喵熊网络科技有限公司 苏ICP备18050492号-4知末 © 2018—2020 . All photos and trademark graphics are copyrighted by their owners.增值电信业务经营许可证(ICP)苏B2-20201444苏公网安备 32011302321234号
客服
消息
收藏
下载
最近