知末
知末
创作上传
VIP
收藏下载
登录 | 注册有礼
知末案例   /   建筑   /   工业建筑

丨法国

2023/04/19 00:00:00
查看完整案例
微信扫一扫
收藏
下载
丨法国-0
Domaine de La Cavale
Cucuron, France
Client
SCEA LA CAVALE
Project team
Architect: WILMOTTE & ASSOCIÉS
Designer: WILMOTTE & INDUSTRIES
Executive Project Architect: MARIOTTI-JAMES
Structure: STRUCTURE TIERCELIN
Cost consultant: GRIGNET
Control office: QUALICONSULT
Floor: E.G.SOL SUD
Building services: SNC-LAVALIN
Wine-making process: AVENIR VINICOLE
Sustainable development: E2S
Surveyor: DUPIN-RICHAUD
Surface area
1 800 sqm
Year
2017
Program
Staging and optimisation of the Domaine's wine-making process through the creation of a high-performance building with new openings onto the surrounding vineyards.
丨法国-23
丨法国-24
丨法国-25
丨法国-26
丨法国-27
丨法国-28
The new winery at Domaine de la Cavale sets the scene and optimises the wine-making process thanks to a building that is unique in the Luberon. This building, which is as attractive as it is efficient, is a blend of mineral and vegetal elements and has new openings onto the surrounding vineyards.
丨法国-30
丨法国-31
丨法国-32
The architectural project, respectful of the existing building, preserves the square plan on which the original building was erected. Developing a unique architecture in the Luberon, both contemporary and respectful of local canons, it is based on the integration of a wall made of local stone, the restructuring and the interior and exterior requalification of the vats and the existing cellar, as well as the extension of the building.
The facade is a true architectural signal and a new showcase for the estate. It uses regional architectural vocabulary, through the use of dry stone from the Saint-Pantaléon quarry and industrial vocabulary borrowed from the world of wine (black zinc cladding for the existing building).
丨法国-35
丨法国-36
丨法国-37
丨法国-38
丨法国-39
Located at the rear of the building, the extension transforms the internal organisation of the building, which now includes a larger storage volume, new technical rooms, a sales room, a tasting room, a presentation room, a shop, technical rooms and new offices. The winery has a new, open central space, offering an exceptional view of the two vats on either side and projecting the visitor into the winemaking process from the very beginning.
A special feature of the estate’s wine-making process is the installation of a weighing machine at the top of the building. The tractors will then have to use the access ramp on the north side of the building and unload the harvest from the roof of the extension building.
南京喵熊网络科技有限公司 苏ICP备18050492号-4知末 © 2018—2020 . All photos and trademark graphics are copyrighted by their owners.增值电信业务经营许可证(ICP)苏B2-20201444苏公网安备 32011302321234号
客服
消息
收藏
下载
最近