知末
知末
创作上传
VIP
收藏下载
登录 | 注册有礼
知末案例   /   建筑   /   交通建筑

Catalyst Connector - Perkins Eastman

2024/03/19 00:00:00
查看完整案例
微信扫一扫
收藏
下载
Catalyst Connector - Perkins Eastman-0
Catalyst Connector - Perkins Eastman-1
Catalyst Connector - Perkins Eastman-2
Catalyst Connector - Perkins Eastman-3
Catalyst Connector - Perkins Eastman-4
Catalyst Connector - Perkins Eastman-5
Catalyst Connector - Perkins Eastman-6
Catalyst Connector
Bellevue, WA
A feasibility assessment and design vision for a major new pedestrian and bicycle connection to span Interstate 405 in downtown Bellevue.
VIA–A Perkins Eastman Studio led a feasibility assessment and design vision to create a bridge and active lid across Interstate-405 for pedestrians and cyclists. The project was undertaken with partner Donald MacDonald Bridge Architects.
This project completes the City of Bellevue’s vision for a ‘Grand Connection’ from its Lake Washington waterfront through its downtown, creating a multimodal corridor and legible link to a regional trail connecting six suburban east-side cities.
The Catalyst Connector ties Bellevue’s commercial core, city hall, downtown, and a new light rail station together with a park in the sky, serving as both a path and a place. The Catalyst Connector is envisioned as an active, safe, sustainable spine with generous pedestrian amenities and cycling facilities as well as future links from building sites into its parks and open spaces.
As a future high-rise neighborhood, the feasibility assessment recommends how to enable vertical connections from future building podiums to the street, creating a seamless integration with the envisioned park. The proposed bridge design is cable-suspended so it clears the freeway below as well as its on-ramp structures. This prominent element also acts as a highly visible landmark.
This project was completed by VIA prior to becoming a Perkins Eastman Studio.
Project Facts
Client:
Amazon Development Group
Size :
2,300 linear feet
Services:
Architecture, urban design, stakeholder facilitation
Practice Areas:
Transportation + Infrastructure
Region:
United States
Studios:
Seattle
Full Feasibility Report
City of Bellevue Project Description
Project Partner Donald MacDonald Bridge Architects' Description
南京喵熊网络科技有限公司 苏ICP备18050492号-4知末 © 2018—2020 . All photos and trademark graphics are copyrighted by their owners.增值电信业务经营许可证(ICP)苏B2-20201444苏公网安备 32011302321234号
客服
消息
收藏
下载
最近