知末
知末
创作上传
VIP
收藏下载
登录 | 注册有礼
知末案例   /   建筑   /   交通建筑

heneghan peng architects - Diamond Bridge, Queen Elizabeth Olympic Park | London

2025/04/02 00:00:00
查看完整案例
微信扫一扫
收藏
下载
heneghan peng architects
Diamond Bridge, Queen Elizabeth Olympic Park | London
London 2012 Olympic Park, UK
Two permanent bridges are linked by a narrow diagonal span over Carpenters Lock at the centre of the Olympic Park. During the Olympics a central temporary infill between the bridges accommodates the crowds. In the legacy park, two bowls are created on either side of the lock linking the upper park concourse with the lower level of towpaths and waterways.
heneghan peng architects - Diamond Bridge, Queen Elizabeth Olympic Park | London-4
heneghan peng architects - Diamond Bridge, Queen Elizabeth Olympic Park | London-5
Embedded within the design for F06 is the understanding that the Olympic / Park concourse should be perceived as a ʻcontinuous landscape that seamlessly extends across the various waterways, railways and roads’ forming a primary movement infrastructure surface for the park.
heneghan peng architects - Diamond Bridge, Queen Elizabeth Olympic Park | London-7
heneghan peng architects - Diamond Bridge, Queen Elizabeth Olympic Park | London-8
Equally important is the connection of the parkʼs two horizontal planes. The concourse upper level, connecting the north and south Olympic park and the ecological lower level made up of the towpaths and waterways.
heneghan peng architects - Diamond Bridge, Queen Elizabeth Olympic Park | London-10
heneghan peng architects - Diamond Bridge, Queen Elizabeth Olympic Park | London-11
heneghan peng architects - Diamond Bridge, Queen Elizabeth Olympic Park | London-12
heneghan peng architects - Diamond Bridge, Queen Elizabeth Olympic Park | London-13
Finally, the design understands that though the duration of the Olympics is short lived, it is this momentum that drives its legacy and the success of the park. Capturing the exuberance of the Olympic games, the surface of the temporary infill deck utilises recycled running shoes to form a multi‒coloured carpet of ‘Confetti’ to celebrate the Olympic moment.
heneghan peng architects - Diamond Bridge, Queen Elizabeth Olympic Park | London-15
heneghan peng architects - Diamond Bridge, Queen Elizabeth Olympic Park | London-16
Fact sheet
Client
Olympic Delivery Authority
Date
2007 (Competition)
Status
Under Construction
Location
London 2012 Olympic Park, UK
Collaborators
Structures | Civil
Adams Kara Taylor II
Structural Steel Specialist
Waagner Biro Stahlbau AG
Cladding Specialist
Waagner Biro Stahlbau AG
南京喵熊网络科技有限公司 苏ICP备18050492号-4知末 © 2018—2020 . All photos and trademark graphics are copyrighted by their owners.增值电信业务经营许可证(ICP)苏B2-20201444苏公网安备 32011302321234号
客服
消息
收藏
下载
最近