查看完整案例

收藏

下载
St. Clare’s Primary School Stage 2
Project:
Conversion of existing Harmony Building to School Foyer, Reception, Admin, Staffroom, School Entry and Landscaping.
Status:
Completed 2023
Builder:
Jardon Group
DESIGN SUMMARY:
St
Clare’s Primary School engaged MUSK Architecture Studio to complete the school
masterplan in 2018. In 2021 our practice completed Stage 01 of the Masterplan,
the Junior School upgrade. Stage 2 was then prioritized to address the severe lack
of street identity and clear pathfinding to the school entry.
The
existing reception and administration space was concealed behind the parish Church.
This created egress hazards by overlapping pedestrian and carparking routes, the
masterplan identified that the school needed a visibly defined and welcoming
entry without the potential safety hazards.
To
achieve this, a 2009 BER facility with an attention-grabbing form has undergone
a comprehensive refurbishment to become the new administration building. This 2
nd
life for an existing building, previously underused by the school, provides
both a cost effective and sustainable solution as the existing building has
been retained and adapted to its new use.
The design
brief included school foyer, reception, school administration and leadership
rooms as well as the staff room with connection to a private outdoor yard. The
new school foyer and reception have now become the focal point of interaction
between the school and the Thomastown community. The school has a visible
presence from the street.
Adaptive
reuse fully retained the external envelope and existing structure. The design
strategy was maximum impact with minimal intervention. The interior partitions have
been selectively stripped out to create the desired reception, general admin,
leadership offices, conference rooms and staff centres. Existing high level
clerestory window have been used to great effect to bring light into the
central circulation spaces.
To integrate the refurbished Harmony building into the site,
the carpark has been realigned to provide a forecourt that fosters interaction
between parents at drop off and pick up and with a new school gate, crossings
and traffic control, pedestrian access is now safely separated from the cars
using the on-site drop off and pickup facilities.
The St Clare’s community is now greeted to the site with a
distinctive entry, designed to foster engagement between all school users. Students
are welcomed into the school through this environment each morning.
Photographer: Tess Kelly
客服
消息
收藏
下载
最近















