查看完整案例

收藏

下载
Main Street Bridge Redux
Embracing experimentation and collaboration at an infrastructural scale.
The Main Street Bridge Redux was one of the first in a four-part collaboration between El Dorado, the City of KCMO, and artist James Woodfill. The introduction of a plan for a streetcar line along Main Street triggered reconsideration of the Main Street Bridge both topographically and pragmatically. The decision was made to reconstruct the new bridge due to topographical constraints of the rails. Embracing common DOT materials, the team was able to quickly tap into pragmatic concerns including acoustical improvements, life safety, ambient illumination, ease of installation, and overall durability.
2013
Architect, Fabricator
Kansas City, MO
35,000 SF
Client
City of KCMO
Eldo Team
David Dowell
Chris Burk
Artist
James Woodfill
Collaborators
Contractor: Pyramid Contractors, Mark Holmes
Electrical Engineer: Lankford Fendler + Associates
Bridge Engineer: HDR
Structural Engineer: Genesis Structures
Awards
2016 Chain Link Fence Manufacturers Institute (CLFMI) - Les Grube Memorial Design Award
Photography
Mike Sinclair
客服
消息
收藏
下载
最近








