查看完整案例

收藏

下载
– STEIG
– STEIG
Steigenberger Hotel und Spa Krems
Description
In response to the cutting edge, the new part of the building begins and develops the existing building along the slope lines until it gently interweaves with the slope.
The recessed ground floor responds to the existing path. The northern sinking terrain incision (forest path) is recorded in the basement. The building is woven in both directions with the existing building and the landscape.
The natural stone wall running along the road is understood as a characteristic and formative design element and remains unchanged.
Team
Klaus Moldan
Emanuele Pelliccioni
Thomas Marian
Karol Fichtel
Client
Ponte Immobilien
Area
3.830m²
Start
2017
Completion
2019
Pictures
Matthias Raiger
GERNER GERNER PLUS
客服
消息
收藏
下载
最近









