知末
知末
创作上传
VIP
收藏下载
登录 | 注册有礼

韦斯特伍德初中重建项目(注:Replacement在这里结合语境推测可能是指学校重建、替换等相关项目,如果有更准确的背景信息,可能翻译会更精准) 丨Pfluger Architects,Fitzpatrick

2024/04/10 00:00:00
查看完整案例
微信扫一扫
收藏
下载
韦斯特伍德初中重建项目(注:Replacement在这里结合语境推测可能是指学校重建、替换等相关项目,如果有更准确的背景信息,可能翻译会更精准) 丨Pfluger Architects,Fitzpatrick-0
Westwood Junior High Replacement
Westwood ISD
This project had its foundation in Pfluger’s assistance to the district in their first successful bond referendum in 40 years. The community’s support made it possible for the Pfluger design team, working with local architects Fitzpatrick, to help the district envision an expanded educational concept. The transformation began by assisting the community in developing design standards that would carry a cohesive identity into the future. The junior high project takes the campus’ five separate buildings and connects them under one roof. We are demolishing two existing spaces: the locker rooms adjacent to the gym and a band storage building, as well as exterior canopies. The rest of the structures will be gutted, with the exception of the gym. The resulting campus will incorporate mass timber elements and extensive glazing. A glass-fronted makerspace at the reconfigured entrance will put learning on display, and the decentralized library and collaboration spaces will encourage inquisitive minds and teamwork.
Client
Westwood ISD
Category
Prek-12
Services
Master Planning, Feasibility Study, Programming, Architectural Design, Interior Design, Contract Administration
Project Team
Christian Owens
Allison Schneider
Edward Rodriguez
韦斯特伍德初中重建项目(注:Replacement在这里结合语境推测可能是指学校重建、替换等相关项目,如果有更准确的背景信息,可能翻译会更精准) 丨Pfluger Architects,Fitzpatrick-14
韦斯特伍德初中重建项目(注:Replacement在这里结合语境推测可能是指学校重建、替换等相关项目,如果有更准确的背景信息,可能翻译会更精准) 丨Pfluger Architects,Fitzpatrick-15
韦斯特伍德初中重建项目(注:Replacement在这里结合语境推测可能是指学校重建、替换等相关项目,如果有更准确的背景信息,可能翻译会更精准) 丨Pfluger Architects,Fitzpatrick-16
韦斯特伍德初中重建项目(注:Replacement在这里结合语境推测可能是指学校重建、替换等相关项目,如果有更准确的背景信息,可能翻译会更精准) 丨Pfluger Architects,Fitzpatrick-17
韦斯特伍德初中重建项目(注:Replacement在这里结合语境推测可能是指学校重建、替换等相关项目,如果有更准确的背景信息,可能翻译会更精准) 丨Pfluger Architects,Fitzpatrick-18
Christian Owens
Principal | Chief Design Officer
Westwood Junior High Replacement
韦斯特伍德初中重建项目(注:Replacement在这里结合语境推测可能是指学校重建、替换等相关项目,如果有更准确的背景信息,可能翻译会更精准) 丨Pfluger Architects,Fitzpatrick-22
韦斯特伍德初中重建项目(注:Replacement在这里结合语境推测可能是指学校重建、替换等相关项目,如果有更准确的背景信息,可能翻译会更精准) 丨Pfluger Architects,Fitzpatrick-23
Allison Schneider
Principal | Interior Design Director
Westwood Junior High Replacement
韦斯特伍德初中重建项目(注:Replacement在这里结合语境推测可能是指学校重建、替换等相关项目,如果有更准确的背景信息,可能翻译会更精准) 丨Pfluger Architects,Fitzpatrick-27
韦斯特伍德初中重建项目(注:Replacement在这里结合语境推测可能是指学校重建、替换等相关项目,如果有更准确的背景信息,可能翻译会更精准) 丨Pfluger Architects,Fitzpatrick-28
Edward Rodriguez
Senior Associate | Senior Specifications Writer
Westwood Junior High Replacement
南京喵熊网络科技有限公司 苏ICP备18050492号-4知末 © 2018—2020 . All photos and trademark graphics are copyrighted by their owners.增值电信业务经营许可证(ICP)苏B2-20201444苏公网安备 32011302321234号
客服
消息
收藏
下载
最近