知末案例   /   公共空间   /   码头

Kingwood Marina District 水岸娱乐综合体

2018/01/25 00:00:00
查看完整案例
微信扫一扫
收藏
下载
翻译
Floating Infinity Pool
Kingwood Marina District 水岸娱乐综合体-1
Floating Infinity Pool
Kingwood Marina District 水岸娱乐综合体-3
Floating Infinity Pool
Kingwood Marina District 水岸娱乐综合体-5
Floating Infinity Pool
Kingwood Marina District 水岸娱乐综合体-7
Floating Bar-Restaurant
Kingwood Marina District 水岸娱乐综合体-9
Floating Bar-Restaurant
Kingwood Marina District 水岸娱乐综合体-11
Marina M4_ Floating Bar-Restaurant
Kingwood Marina District 水岸娱乐综合体-13
Marina M4_ Floating Bar-Restaurant
Kingwood Marina District 水岸娱乐综合体-15
Marina M4_ Floating Bar-Restaurant
Kingwood Marina District 水岸娱乐综合体-17
Floating Cinema
Kingwood Marina District 水岸娱乐综合体-19
Floating Cinema
Kingwood Marina District 水岸娱乐综合体-21
Floating Cinema
Kingwood Marina District 水岸娱乐综合体-23
The Promenade
Kingwood Marina District 水岸娱乐综合体-25
The Promenade
Kingwood Marina District 水岸娱乐综合体-27
The Herons Kingwood Marina development_ Aerial view
Kingwood Marina District 水岸娱乐综合体-29
The new Marina District is situated on the San Jacinto River and it is of central importance in the Kingwood Marina development. It includes two basins – Marina East and Marina West - with a total capacity of more than 700 berths, for boats up to 40 feet, and 220 platforms for jet skis.
The project has been conceived by following the most modern criteria regarding the design of marinas: it is universally accepted that a modern marina must offer much more than just berths and that other essential structures and floating solutions can add valuable amenities. It has also been proved that centralising revenue-creating operations has a positive impact on marina revenues and the “all-inclusive integrate marina” solutions are generally appreciated by the marina operators.
Therefore, both the east and west marina have been designed as a mix of service structures and a variety of entertainment facilities, both on water and on land. A floating swimming-pool, a floating cinema/theatre, a restaurant-cafè and a lounge area will be located directly on water on custom-made platforms with all the necessary associated equipment. The work-out areas, playgrounds and other lounge areas will be on land along the promenade.
A system of special floating platforms, (Floating Treatments Wetlands), will provide habitat and clean the water of the two marinas by creating a natural “concentrated” wetland effect, using plants and naturally occurring bacteria. This is a new and powerful tool for monitoring and safeguarding the health of water and marine life, which was first tested in particularly polluted lakes and today has become popular even in the heart of some cities.
Year 2017
Work started in 2018
Client Private
Status Current works
Type Parks, Public Gardens / Waterfront / Landscape/territorial planning / Apartments / Multi-family residence / Office Buildings / Tower blocks/Skyscrapers / Business Centers / Cinemas / Shopping Malls / Hotel/Resorts / Tourist Facilities / Beach Facilities / Bars/Cafés / Restaurants / Modular/Prefabricated housing / Leisure Centres / River and coastal redevelopment / Marinas / Bridges and Walkways / Cycle Paths
南京喵熊网络科技有限公司 苏ICP备18050492号-4知末 © 2018—2020 . All photos and trademark graphics are copyrighted by their owners.增值电信业务经营许可证(ICP)苏B2-20201444苏公网安备 32011302321234号