查看完整案例
收藏
下载
翻译
Building
Building
Main Hall
Main Hall
Main Hall
Main Hall
Main Hall
Classroom Hallway
Office Hallway
Informatic Hallway
Classroom
Library
Library
Library
Library
Library
Library
Library Shelves
Library Shelves
The new campus has been designed with a view to visual, acoustic and environmental comfort, with particular attention to the problem of energy saving, avoiding invasive technologies and those not in harmony with the high profile architecture of the project.
The complex is developed according to the concept of Building Automation, or the intelligent building with integrated and computerized management of the technological systems, computer equipment and communications networks.
The advantage consists of optimising the life cycles of the constituent systems and their equipment, of reducing occupancy costs and increasing organizational productivity.
In a complex like the Campus, with so many different uses - classrooms, libraries, cafeterias, offices, car parks - to manage the different zones independently allows the regulation of consumption according to actual use of the building.
Year 2012
Work started in 2007
Work finished in 2012
Main structure Mixed structure
Client Università degli Studi di Torino
Contractor A.T.I. - Codelfa - Gozzo - Edart
Cost 95.000.000 Euro
Status Completed works
Type Colleges & Universities / Libraries