这是由Pablo Notari Oviedo、SUMAR urbanismo y arquitectura与 CONURMA IngenierosConsultores联合设计的坎塔布里亚科技园区。这是由PCTCAN公共公司组织的竞赛获奖项目,为坎塔布里亚科技园区设计两座办公楼。这两座建筑形成了两个正棱柱,其颜色与对比成为了设计中的主题。建筑的正式形象是以可持续和节能标准为基调,同时要体现其功能性,采用简单的技术解决方案以减少建设成本,优化模块化与灵活化的功能。考虑到各个立面的朝向,立面使用了不同处理方式,以优化大阳能的使用。
译者:筑龙网艾比
From the architect. Winner Project of a competition organized by the public company PCTCAN, for two office buildings in the "Scientific and Technological Park of Cantabria".The buildings conform two regular prisms, where color and contrast play a predominant role. The formal image of the buildings is based on sustainability and energy savings criteria, but also on its functionality, adopting simple technical solutions in order not to increase the construction costs, and prioritizing functional aspects of modularity and flexibility.
The differential treatment of their façades, adapted to each orientation, seeks to achieve an optimal use of solar energy.Plants, completely open, can be divided into several offices with separate entrances, allowing to accommodate different companies and giving great flexibility.The structure is solved with a central concrete core (with the vertical communications, toilets, ducts and piping), and a perimeter of small steel columns integrated in the façade, in order to achieve a completely open floor without intermediate columns.
The buildings rise on a half-buried stone plinth, surrounded by curved landscaped slopes that give contrast to the building rigid geometry. Over this base, the access floor, glazed and set back from the rest of plants, is located. And above all, the colorful office prism that seems to levitate in the plot.
The architectural language integrates environmental solutions. The main volume, that locates four office plants, is solved with a ventilated façade of thermosetting resins panels. Openings are treated in each façade differently depending on their orientation. In the East and West façades horizontal windows are protected by vertical louvers made with the same façade panels, integrating them into its modulation and colorful. This solution gives a very different aspect to the façade depending on the angle from which you observe it, from a totally blind façade, to a complete open one. Instead the North and South façades open to the landscape through large curtain walls. On the South side, the façade is protected from solar radiation by large aluminum louvers. In both façades, maintenance catwalks have been integrated in the design, avoiding the installation of gondolas.Up to date only one of the buildings it has been built, being the construction of the second planned in 2017.Hasta la fechasólo se ha construidouno de los edificios, estandoprevista la construccióndelsegundo en 2017.