分享
收藏
下载
登录查看完整案例
剩余74%未读,登录后即可浏览
Camp del Ferro新体育中心
浏览166
发布时间:2020-12-18
设计亮点
半地下空间利用、百叶遮阳、交叉通风、LEED 金牌认证
该项目是巴塞罗那的新体育中心,由AIA、Barceló Balanzó Arquitectes和Gustau Gili Galfetti三家事务所共同设计,醒目的便民设施为城市创造了新的公共空间。设计方案利用半地下空间,有效地解决了在高密度环境的有限地块中建造一栋大体量建筑的问题。建筑体积、百叶遮阳、交叉通风等设计降低了能耗,获得了LEED(能源与环境设计先锋绿色建筑评价体系)的金牌认证。
The team made up of AIA, Barceló-Balanzó Arquitectes and Gustau Gili Galfetti designs Camp del Ferro, Barcelona’s new sports centre, a visually striking amenity that brings public space to the city. The density of the location, the limited dimensions of the site and the large scale of the brief—the problems tabled by the commission—are counteracted by a useful design solution that consists of semi-undergrounding the facility. Decisions such as the volume of the building, the use of lattice walls for solar protection and the existence of cross ventilation serve to minimize energy requirements and earn LEED Gold certification.
▼建筑鸟瞰,aerial view © Simón García
收藏此图
下载无损原图
2015年,AIA事务所的建筑师Albert Salazar Junyent和 Joan Carles Navarro、Barceló Balanzó Arquitectes事务所的建筑师Antoni Barceló和 Bárbara Balanzó以及负责施工的Gustau Gili Galfetti合作的设计方案赢得了由BIMSA巴塞罗那市政基础设施工程部发起的竞赛。该项目于2017年开始施工,占地面积为7237㎡。目前刚刚落成,成为圣安德鲁区新的便民设施,设有三个室内运动场,以及一个与运动场紧密相连的公共空间,更加便捷可达。考虑到需要在高密度环境的有限地块中建造功能复杂的大体量建筑,设计团队权衡利弊后决定将体育中心的大部分空间置于半地下,并通过功能布局确保了良好的采光、自然通风和疏散可达性。这种半地下的形式还为自身以及街区和城市带来了显著的好处,不仅减少了巨大体量造成的视觉冲击,还创造了城市公共空间,激活了周围环境。这片自由的区域起到重要作用,很好地解决了复杂地块的可达性问题。
▼总平,site plan © AIA + Barceló Balanzó Arquitectes + GGG
收藏此图
下载无损原图
The project by architects Albert Salazar Junyent and Joan Carles Navarro (partners at AIA), Antoni Barceló and Bárbara Balanzó (members of the Catalan practice Barceló-Balanzó arquitectes) and the architect Gustau Gili Galfetti for the construction of the Camp del Ferro municipal facility in the Sagrera neighbourhood (Barcelona) won first prize in the public competition announced by BIMSA in 2015. Construction of the work, with a surface area of 7,237 m2, began in 2017. Now, recently inaugurated, it provides the Sant Andreu district with an amenity that includes three sports courts and a public space that improves accessibility and connection with the new infrastructure.Given the large volume required by the extensive functional brief of the Camp del Ferro in relation to the limited dimensions of the site and the density of nearby buildings, the team of architects, after weighing the advantages and disadvantages, decided to semi-underground much of the sports complex. This intervention, by means of section mechanisms, ensures good lighting, natural ventilation and ease of access or evacuation of the lower areas. It is also a design decision that brings notable benefits to the amenity, the neighbourhood and the city, since, apart from reducing its visual impact, it generates a public space that acts as an urban foyer for the complex and facilitates movement around it. This free area is essential, comfortably addressing the issue of access and the complicated urban fabric of the enclave.
▼正立面,main facade © José Hevia
收藏此图
下载无损原图
建造追溯传统记忆,选用当地工厂、仓库和工坊中常见的砖材。由于财政紧缩政策,当地大多数建筑的墙体直接构成外表皮,不附加多余的装饰元素。该项目的外立面选用耐久性良好的砖材,将不同样式和颜色的砖以虚实交替的形式砌筑成不透明、半透明和全透明的墙体。
The chosen construction process recovers the memory of local traditions by using a material such as brick, very common in the old neighbouring factories, warehouses and workshops. Adopting the criteria of austerity of resources and means, in much of the building the construction system itself constitutes the finish, avoiding superposed elements. The same goes for the façades of bare brick, a material that ensures good aging and long life. At the same time, with the aim of lightening the whole in all of its façades, the design alternates empty and full, opaque, translucent and transparent parts, and bricks of different formats and colours.
▼侧立面,side facade © Simón García
收藏此图
下载无损原图
没有更多了
相关推荐
搜索
搜索历史清空
暂无历史记录~