翻译
分享
收藏
下载
登录查看完整案例
剩余83%未读,登录后即可浏览
荷兰 Lan Handling Technologies 办公楼
浏览18
发布时间:2019-10-09
设计亮点
充分利用三角形地块,打造五连拱建筑结构,实现功能分区与采光需求。
Architects:Cepezed
Area :6747 m²
Year :2019
Photographs :Lucas van der Wee
Manufacturers : AutoDesk, Ashford sikavloer, Icopal, MAARS, Orona Pecres, Raico LaukienAutoDesk
Engineering :IMd Raadgevend Ingenieurs
Consultants :Nelissen Ingenieursbureau, Eindhoven. DGMR Bouw
Clients : Lan Handling Technologies b.v.
Collaborators : Cepezed
Country : The Netherlands
收藏此图
下载无损原图
收藏此图
下载无损原图
The new business premises include 1,500 m² of office space and 5,000 m² of halls. The design is importantly determined by the plot, which roughly has the shape of a rectangular triangle. Along its outer edge, there is a one-way traffic ring including parking spaces and options for dispatching. For what remains, the plot is completely filled. The building itself is composed of five connected naves. These are each more than 10 meters high and 18 meters deep. In length, they run back from around 88 to 24 meters. As a result, the building has a saw-tooth structure along the slanting plot side.
收藏此图
下载无损原图
收藏此图
下载无损原图
没有更多了
相关推荐
搜索
搜索历史清空
暂无历史记录~