翻译
分享
收藏
下载
登录查看完整案例
剩余67%未读,登录后即可浏览
Swatch 和 Omega 木质校园
浏览29
发布时间:2019-10-18
设计亮点
采用大量木材建造,实现环保与员工舒适度的双重考虑,展示出未来建筑的可能性。
Architects:Shigeru Ban Architects
Area :25000 m²
Year :2019
Photographs :Didier Boy de la Tour, Philippe Zinniker
Manufacturers : Blumer Lehmann, Bruag, Fabromont AG, KieferBlumer Lehmann
Lead Architects :Shigeru Ban
Structural Engineering :LEICHT France SAS
City : Biel
Country : Switzerland
收藏此图
下载无损原图
收藏此图
下载无损原图
At 46,778 sq m (503,514 sq ft), the project is Shigeru Ban Architects’ largest and most exuberant hybrid mass timber project to date, and one of the largest hybrid mass timber projects in the world. Through his disaster relief work, Shigeru Ban has experienced firsthand the direct impact of climate change and natural disasters causing adverse effects on both people and the planet. Climate change is a reality that must be addressed both in how we live and how we build: our individual decisions to reduce energy consumption and carbon emissions can change the world. However, building construction in its current state does not responsibly consider the future and well-being of our planet. To this end, Shigeru Ban Architects promotes building in wood as a model for environmental consciousness. Although timber is one of the oldest building materials, it is also one that holds much promise for the future.
收藏此图
下载无损原图
The Swatch and Omega Campus is a monumental timber building project, comprised of three buildings: The Swatch Headquarters – Swatch’s multistory office space; The Omega Factory – the production center of Omega watches; and Cité du Temps – the Swatch and Omega museum and conference hall. The buildings share a design language, material palette, and environmental ethos, reflecting the unified brands of Swatch and Omega while expressing each building’s individuality through contrasting structural forms.
收藏此图
下载无损原图
没有更多了
相关推荐
搜索
搜索历史清空
暂无历史记录~