翻译
分享
微信扫一扫
收藏
下载
登录查看完整案例
剩余87%未读,登录后即可浏览
温布尔登国王学院音乐学校
浏览23
发布时间:2020-04-06
设计亮点
巧妙利用传统手工材料,打造与环境和谐共生的音乐学习空间。
Architects:Hopkins Architects
Area :2160 m²
Year :2018
Photographs :Janie Airey
Manufacturers :  HASSLACHER NORICA TIMBER, HESS TIMBER, Allgood, Decor Systems, Junckers, Chatsworth Stone Masonry Ltd, Coopers Fire, Creagh Concrete, Gildacroft Ltd, IG Lintels, Input Joinery Ltd, Lignacite, Lockmetal, Michelmersh, Race Furniture, Stannah Lifts, Tudor Roof TilesHASSLACHER NORICA TIMBER
Project Management :Equals Consulting
Arboriculturist :Simon Jones Associates
Architect In Charge : Hopkins Architects
Clients : King’s College School Wimbledon
Structural Engineers : Cundall
Environmental / M&E Engineers : Chapman BDSP
Environmental Engineers : Chapman - BDSP
M&E Engineers : Chapman BDSP
Mechanical & Electrical Engineers : Chapman - BDSP
City : London
Country : United Kingdom
收藏此图
下载原图
温布尔登国王学院音乐学校-16
下载原图
温布尔登国王学院音乐学校-17
The Music School at King’s College School, Wimbledon, features a 200 seat concert hall surrounded by a rehearsal and teaching space. The architectural challenge was that it must sit comfortably on an irregular site, relate to neighbouring arts and crafts houses and complement the larger school buildings.
收藏此图
下载原图
温布尔登国王学院音乐学校-19
The result is a carefully arranged group of three linked, but individual buildings, positioned to be viewed amongst a group of existing trees, embedding it smoothly within the school environment. Hand crafted traditional materials on the outside help fit the new architecture into the local context whilst the interiors express the timber roof construction engineered to provide the best possible acoustics for performance and rehearsal.
收藏此图
下载原图
温布尔登国王学院音乐学校-21
没有更多了

作品0

浏览0

关注0

相关推荐
南京喵熊网络科技有限公司 苏ICP备18050492号-4知末 © 2018—2020 . All photos and trademark graphics are copyrighted by their owners.增值电信业务经营许可证(ICP)苏B2-20201444苏公网安备 32011302321234号
搜索
搜索历史清空
暂无历史记录~