翻译
分享
收藏
下载
登录查看完整案例
剩余84%未读,登录后即可浏览
集装箱式工厂总部,无砂浆建筑创新实践
浏览40
发布时间:2019-02-25
设计亮点
利用生产材料,创新无砂浆建筑结构,提高空间利用效率。
The need to open the place, the low budget available and the rented land all played a role in preventing the construction of conventional headquarters for this block factory in Avaré, in São Paulo state. In this context, the partners considered acquiring a container, but it seemed nonsensical to house the future head office and showroom of the factory without employing the material that it produces.
收藏此图
下载无损原图
收藏此图
下载无损原图
收藏此图
下载无损原图
It was during a visit to the warehouse and from observing the storage and transportation system of the blocks that the idea of building without the use of mortar materialized. Thus, the construction process would look more like an quick assembly, with the added advantage that the material could be completely reused in case the structure had to be relocated.
收藏此图
下载无损原图
没有更多了
相关推荐
搜索
搜索历史清空
暂无历史记录~