As a solution to the challenges faced because of the Covid-19 pandemic, the Little Tiger Chinese Immersion School chose to move a large portion of its classes outdoors. Over the summer the school director reached out to our office to design an outdoor classroom that could be built quickly and affordably before the start of the new Fall 2020 school year. Their primary concern was to shelter the children from the intense Texas sun. The temporary structure cost less than $3000 USD and took about a week to build. It is composed primarily of wood 2x4’s which are secured to the ground with threaded pile anchors that can be easily removed when the structure is taken down, leaving no trace that it was there.
We choose to use stick framing for several reasons, primarily that it is fast, flexible, and affordable. The A-frame walls are very stable and include built-in linear benches for the kids to sit on. We are also fans of the granular and intricate structural expression of stick frame construction and look for opportunities to explore innovative applications of this common building system. Here the design figure and strength comes from the repetition of members.