翻译
分享
收藏
下载
登录查看完整案例
剩余88%未读,登录后即可浏览
巴西议会供应与管理设施大楼
浏览26
发布时间:2018-12-31
设计亮点
现代建筑风格,注重环保节能,室内设计简洁明亮。
As part of the actions focused on the rearranging of spaces in the main complex of the Brazilian parliament, the building for the Supplies and Management Facility for the Chamber of Deputies was constructed in an area specifically destined for this purpose in the outskirts of Brasília, the Sector of Supplies and Industries.
收藏此图
下载无损原图
收藏此图
下载无损原图
Aiming to enable the transference of whole departments of the institution, it was intended for the new building to hold areas for storage and control of supplies, as well as offices connected to the management of these resources. The architectural composition seeks to express such functions. The large white volume, which is closed, is destined for the storage warehouse, which has a triple ceiling height, designed for vertical storing.
下载无损原图
The concrete towers define the second volume, which holds the office spaces, marked by the horizontal brise-soleils on the façade and by the garden terrace for common use. In the transition and connection between these volumes, the marquee stretching up to the main access completes the ensemble, enclosing the maneuvering yard and ramps to the docks next to the warehouse.
收藏此图
下载无损原图
没有更多了
相关推荐
搜索
搜索历史清空
暂无历史记录~