翻译
分享
微信扫一扫
收藏
下载
登录查看完整案例
剩余70%未读,登录后即可浏览
重塑校园空间,提升教育品质——东 Aurora 高中的扩建与改造
浏览139
发布时间:2020-07-16
设计亮点
新建筑提升学生、教师和行政人员的士气,改善学校形象。

Cordogan Clark completed the expansion of East Aurora High School with better facilities for both learning and athletics in Aurora, Illinois.

Building a great school creates lasting value while fostering pride for all involved. East Aurora High School’s expansion and renovation greatly advances student education for the students, faculty, and administration. Designed to address capacity and congestion issues, the new architecture boosts student, faculty, and administration morale and the school’s image. “It’s been humbling to say the least,” East Aurora High School Principal Marina Kosak said. “Because a lot of times it was, this is East Aurora, and they never thought they would have such a beautiful space.” The investment in East Aurora High School is also an investment in the community. Ms. Kosak, added, “The kids are in awe.”

Before, the school’s hallways were overcrowded and difficult to navigate from one classroom to the next. A significant reconfiguration of the hallways greatly reduced congestion, easily allowing students to arrive at their class on time. With more than 300,000 SF of new space added, the school’s 4,000 students have more elbow room. The work also includes a new entrance with an open-forum plan, bench seating, and 28-foot ceilings that slope up from the middle to harvest natural light. There are also 20 new classrooms, a fine arts addition, and science rooms, cafeteria and kitchen, library and locker room renovations.

The existing facility’s many challenges were overcome with the new addition and renovation, realigning the facility for 21st century learning objectives. Environmental concerns and a track that did not meet Illinois High School Association standards for competition, were also addressed with the construction of the $7 million state-of-the-art stadium. Designed for football, track, soccer, Junior ROTC, and physical education classes, the well-equipped stadium seats 3,500 and features artificial turf, an expansive press box with separate rooms for opposing teams, concession stands, energy-efficient LED lights, a new scoreboard, and an inscribed paver plaza that greets visitors at the front entrance and display the Tomcat pride.

Architect: Cordogan Clark Photography: James Steinkamp

13 Images | expand images for additional detail

下载无损原图
重塑校园空间,提升教育品质——东 Aurora 高中的扩建与改造-6
下载无损原图
重塑校园空间,提升教育品质——东 Aurora 高中的扩建与改造-7
下载无损原图
重塑校园空间,提升教育品质——东 Aurora 高中的扩建与改造-8
下载无损原图
重塑校园空间,提升教育品质——东 Aurora 高中的扩建与改造-9
没有更多了

作品0

浏览0

关注0

相关推荐
南京喵熊网络科技有限公司 苏ICP备18050492号-4知末 © 2018—2020 . All photos and trademark graphics are copyrighted by their owners.增值电信业务经营许可证(ICP)苏B2-20201444苏公网安备 32011302321234号
搜索
搜索历史清空
暂无历史记录~