查看完整案例
收藏
下载
“养生”让我们联想到生机勃勃的绿色,改善现有环境变得清新也同样让我们想到绿色。所以在整体色调的考虑上,我们尝试绿色的风格。因为初衷是希望环境可以像名字一样“傲娇”,能让人豁然开朗,感受到椰林的意味。
"Health" reminds designers of vibrant green, and improving the existing environment to become fresh also reminds designers of green. So in the overall color consideration, the designer tried the green style. Because the original intention is to hope that the environment can be as "arrogant" as the name, so that people can suddenly feel the meaning of coconut forest.
外部环境虽然有些苛刻,但内部构造还是让我们欣慰,大片弧形的落地窗,视野开阔。根据弧形结构,同样做了弧形明档;三根直径1米的圆形大柱子被木质隔断连接成整体,在空间中若隐若现;所有就餐位都是按照弧形方式摆放,使整个空间具有条理性。现场也有一些不可抗拒因素,如地面错层不能拆除,吊顶钢板结构不能吊顶,不能安装灯具.....但最终整套设计方案在我们共同努力,日夜兼程下六天内完成。
Although the external environment is somewhat harsh, the internal structure still makes the designer happy, with a large curved landing window and a wide field of vision. According to the arc structure, an arc is also made; Three large round pillars with a diameter of 1 meter are connected by wooden partitions and appear in space. All dining spaces are arranged in a curved manner, making the entire space organized. There are also some irresistible factors on the scene, such as the ground layer can not be removed, the ceiling steel plate structure can not be suspended, and lighting can not be installed. .. .. .. .. However, the final design package was completed within six days after the designers worked together.
独立包间作为整个餐厅唯一一个,而且隶属位置因为风管缘故没有采光,所以我们选用敞开式包间,主背景墙选用高低错层,面层肌理的椰叶造型,镀钛拉丝不锈钢收边又让人有轻奢的感受,与后期整体家具灯具形成一体。我们利用施工进行时定制家具,三十天完成硬装,四天完成软装布场,从设计到施工历时40天,彻底呈现了我们想要的效果。
The independent compartment is the only one in the entire restaurant, and the subordinate location is not lit because of the wind pipe. Therefore, we choose the open compartment. The main background wall chooses the high and low layers, the coconut leaf shape of the surface layer, and the titanium wire stainless steel. The edge of the end makes people feel extravagant. Form one with the whole furniture lamps in the later period.We use the construction time custom furniture, 30 days to complete the hard-fitting, four days to complete the soft cloth field, from the design to the construction of 40 days, completely demonstrated the effect we want.