查看完整案例
收藏
下载
特别地,英国摄影师Nick Ballón 还为该项目拍摄了名为“Making 25 Savile Row”的短片,记录了Derwent London新总部脱胎换骨的过程。
A short film “Making 25 Savile Row” by Nick Ballón records the project as for the fit-out of Derwent London’s new offices.
▼建筑立面,building facade
©Jack Hobhouse
Location: 25 Savile RowLondon W1S 2ER
Client:Derwent London
Architect:Piercy&Company
Type:Offce. Cat A refurbishment and Cat B Fit Out
Size: Phase 1 (Derwent London Offces; Basement, Ground, First and Second Floors): 24,963 sqft. (NIA) 37,964 sqft (GIA)
Phase 2 (Third, Fourth, Fifth and Sixth Floors): 18,784 sqft (NIA) 23,552 sqft (GIA)
Completion Date:Phase 1 Completed April 2017
Phase 2 Completion January 2018
Sustainability: SKA Gold for Fit OutBREEAM Very Good
Contract Type: Traditional JCT SBC/Q 2011
Main Contractor: Knight Harwood
Structural Engineer: Akera Engineers
Project Manager: Blackburn&Co
Quantity Surveyor: Exigere
Lighting Designer: Pritchard Themis
Services Engineers: Hilson Moran
CDM / Building Regulations: MLM
IT: Mix Consultants
Specialist Glazing: IQ Glass
Shopfront Glazing Package: Capoferri Serramenti
Specialist Metalwork: Chay Wheeler Architectural Metalworker Specialist Joinery: Benchmark
General Joinery: Adams
Dry lining: David Andrews Construction
Travertine: Campolonghi Serramenti
Stone & Ceramic: Unique Surfaces
Leatherwork: Bill Amberg Studio
Builderswork: Pristine
Electrical: M&M
Mechanical: T Clarke
Decoration: DEC
Flooring: AJK Flooring
Lifts: Specialist Lift Company
Facade Repairs and Decoration: Paye
Architectural Metalwork: Arminhall
Kitchens: Dada
Blinds: Soltech
Still Photography: Hufton + Crow
Film Credits:
Director: Nick Ballon
Cinematographer: Jorge Dieguez
Production: Jahel Guerra
Field Recording: Jahel Guerra
Editor: Jaroslav Moravec
Music Composition: Jean-Gabriel Becker, Sounds And Sons