知末案例   /   建筑   /   办公建筑   /   AFF architects

德国汉诺威主货运站翻新

2020/02/07 10:30:11
查看完整案例
微信扫一扫
收藏
下载
翻译
Architects:AFF architekten
Area :22693 m²
Year :2019
Photographs :Hans-Christian Schink
Landscape :Topotek 1
City : Hannover
Country : Germany
德国汉诺威主货运站翻新-7
德国汉诺威主货运站翻新-8
The main freight station, built in the 1930s, was badly damaged by bombs during World War II. Some of the damage caused by the war is still visible today in the form of splinter holes or misaligned pillars.
德国汉诺威主货运站翻新-10
德国汉诺威主货运站翻新-11
After the end of World War II, the reconstruction of the main freight station began. The main freight station in Hanover is parallel to the Hanover - Hamburg / Bremen line on the corner of Weidendamm and Arndtstraße. The dimensions of the main goods hall are around 377m in the longitudinal direction of the hall (north-south direction) and between 101 and 68m in the transverse direction of the hall (east-west direction), the hall tapers from south to north.
德国汉诺威主货运站翻新-13
The supporting structure of the hall was made of steel. Thanks to the convenient location close to the city center, the aim is to convert the entire area over the next few years. One part of the former goods hall will be dismantled and the remaining part will be renovated.
德国汉诺威主货运站翻新-15
▼项目更多图片
德国汉诺威主货运站翻新-17
南京喵熊网络科技有限公司 苏ICP备18050492号-4知末 © 2018—2020 . All photos and trademark graphics are copyrighted by their owners.增值电信业务经营许可证(ICP)苏B2-20201444苏公网安备 32011302321234号