知末
知末
创作上传
VIP
收藏下载
登录 | 注册有礼

Alfriston 游泳池

2019/08/10 16:29:33
查看完整案例
微信扫一扫
收藏
下载
翻译
Architects:Morris+Company
Year :2014
Photographs :Jack Hobhouse
Manufacturers :  Sto, Altro, Buckingham Swimming Pools, Cowley Timberwork, Domus Tiles, EcoChoice, PJB cladding, Pratley carpentry, RidlandsSto
Structural Engineer :Elliott Wood Partnership
Environmental Engineer :Skelly & Couch
Client : Alfriston School
Contract : D&B JCT
Cost Consultants : Appleyard & Trew
Cdm Coordinator : Appleyard & Trew
Approved Building Control Inspector : Butler & Young
Contract Value : £1.8m
Annual Co2 Emissions : 56.7 kg CO2/m²/year
Square Metre Cost : TBC
Gross Internal Area : TBC
Approved Building Control Inspector : Butler & Young
Country : United Kingdom
Alfriston 游泳池-17
Alfriston 游泳池-18
The scheme consolidates the existing and new sports facilities into a fully integrated sports department defined by one singular block containing gym, changing facilities, fitness suite, admin offices and swimming pool. A new changing facility is connected onto the side of the existing gym with the pool extending into the landscape beyond.
Alfriston 游泳池-20
Alfriston 游泳池-21
Alfriston 游泳池-22
The site levels have been altered to bring the primary entrance to the sports department central to the pool and gym with a secondary entrance to the rear of the gym permitting a public and private entrance to suit out of hours use. The new arrangement caters for 24 pupils within the pool at any one time and a further 24 in the gym building.
Alfriston 游泳池-24
Wide access ways and large storage areas are included to service varying disabilities and hoist equipment. The overall permissable build footprint within the defined area was compressed by the greenbelt to the south skirting around the playing fields and the protected trees to the north.
Alfriston 游泳池-26
The new pool building, sits discreetly at the rear of the site, facing directly onto the greenbelt land. Intended to be a contemporary expression of the local pitched roof vernacular, but executed with subtlety, the design of the new pool enclosure envisages a raised timber structure, articulated by three repeated folded roof segments.
Alfriston 游泳池-28
The roof creates a dramatic internal landscape iewed from within the pool and also serves as an acoustic baffle thus preventing a high reverberation of sound, which is a crucial aspect of the brief. A 1m narrow glass strip arond the edge of the building, separates the pool roof from the rest of the base reinforcing the apparent floating form. Thus the privacy of pool users is protected and the panoramic view preserved.
Alfriston 游泳池-30
▼项目更多图片
Alfriston 游泳池-32
Alfriston 游泳池-33
Alfriston 游泳池-34
Alfriston 游泳池-35
Alfriston 游泳池-36
Alfriston 游泳池-37
Alfriston 游泳池-38
Alfriston 游泳池-39
Alfriston 游泳池-40
Alfriston 游泳池-41
Alfriston 游泳池-42
Alfriston 游泳池-43
Alfriston 游泳池-44
Alfriston 游泳池-45
Alfriston 游泳池-46
Alfriston 游泳池-47
Alfriston 游泳池-48
南京喵熊网络科技有限公司 苏ICP备18050492号-4知末 © 2018—2020 . All photos and trademark graphics are copyrighted by their owners.增值电信业务经营许可证(ICP)苏B2-20201444苏公网安备 32011302321234号
客服
消息
收藏
下载
最近