知末案例   /   教育空间   /   小学   /   Architectus

Carey Baptist Grammar School 教学空间重塑

2019/06/03 00:00:00
查看完整案例
微信扫一扫
收藏
下载
翻译
View of Northern Facade
Carey Baptist Grammar School 教学空间重塑-1
View from Barkers Road
Carey Baptist Grammar School 教学空间重塑-3
View of Forecourt and Entry Canopy
Carey Baptist Grammar School 教学空间重塑-5
The Street (Level 2)
Carey Baptist Grammar School 教学空间重塑-7
The Street (Level 1)
Carey Baptist Grammar School 教学空间重塑-9
The Keyhole
Carey Baptist Grammar School 教学空间重塑-11
Carey Baptist Grammar School is a leading Christian co-educational independent school, committed to student-centred learning and well-being. It is an open-entry school with a philosophy of education that is based around a broad and challenging curriculum. The redevelopment of Carey’s Middle School building is a critical component of the school’s strategic plan to accommodate strong growth in student numbers.
In collaboration with school leaders, students and teachers, Architectus developed an Education Design Brief that responds to the specific needs of Carey’s Middle School students and their teachers. It describes six interconnected learning precincts, each of which is a physical expression of the subject it hosts and the learning experiences and resources students and teachers can expect to find there. Each learning precinct is composed from a wide variety of purposeful learning settings and clearly articulated circulation paths.
The Middle School scheme is premised on three key design elements: the formal determination of the building by its context; a fully developed education plan, and the creation of an architectural framework to support the education plan.
The south and west elevations comprise a series of boxes alternately slipped in and out within a fabricated steel frame that outwardly express the diagram of the internal plan. The proportions and modularity of these primary forms are a direct manifestation of the internal spatial requirements of the Education Design Brief, and a response to the fine physical grain of the building’s suburban context.
Year 2020
Work started in 2016
Work finished in 2020
Client Carey Baptist Grammar School
Status Current works
Type Schools/Institutes
南京喵熊网络科技有限公司 苏ICP备18050492号-4知末 © 2018—2020 . All photos and trademark graphics are copyrighted by their owners.增值电信业务经营许可证(ICP)苏B2-20201444苏公网安备 32011302321234号