知末案例   /   家装空间   /   公寓

法国里昂木构公寓丨Tectoniques Architects

2014/07/14 02:25:03
查看完整案例
微信扫一扫
收藏
下载
Lyon France housing
设计方:Tectoniques Architects
位置:法国 里昂
分类:居住建筑
内容:实景照片
图片来源:On Stage
项目规模:5,241平方米
图片:23张
法国里昂木构公寓丨Tectoniques Architects-8
这栋住宅楼位于里昂的Duchere社区,是由Tectoniques Architects设计建造的。这里有33套租赁住房,还有1500平方米的办公空间,用于开展健康有关的活动,一楼还有零售区。这里地处Abbé Pierre广场和东/西大道之间,靠近体育馆,交通便利。大楼满足了城市发展的需求,提倡木材的使用,为市民提供愉快、舒适的居住环境。大楼的技术工程比较复杂,但建筑风格很柔和,看着很舒服。住房、服务中心(医疗中心)和零售店都有各自的设计风格。
住宅楼沿街而建,这周围有多种体育设施,东边有广场,西边有公共花园和商店,便利了居民的生活。这里地理位置好,里面的住房密度较大,有8层住宅楼和6层办公楼。这里就像是城市的缩影,建有两层地下停车场,有57个停车位。一层有972平方米的零售区,上面是公寓,还有1500平方米的医疗中心。住宅区的设计更为抽象,零售区的设计比较开放,周围是公共活动区。大楼建有玻璃外观,视野开阔,便于采光。采用的都是高性能的建筑材料,主体为混凝土结构,外墙有木制设计。
木墙和混凝土墙相比,更加轻薄,预制组件的使用可以加快施工的进度,更安全、高效。北边外观的施工只用了短短三周。住宅区的设计比较狭长,住房不是很宽,算上阳台和走廊有8米。公寓内设计简约,根据生物气候学的原理,起居室朝南,厨房、卧室和浴室朝北。南边的阳台有2米宽,比较宽敞,窗户比标准规格要大,利于采光,扩展了居住空间。外部的护栏是木质的,上面有百叶窗,设计元素比较多元。阳台上有木质包层和热固性树脂板,还有金属装饰,前面还有冷杉板。室外有宽敞的通道,便于居民出行。大楼的顶部是绿色屋顶,设有热水集水器。
译者: Odette
From the architect. Block 32 occupies a strategic position in the vast programme to renovate the Duchère neighbourhood, in Lyon. The OPAC du Rhône housing association has produced a building which incorporates 33 social rental housing units, 1,500m2 of office space dedicated to health-related activities, and has retail space throughout the ground floor. Its central location, at the crossroads between the new Abbé Pierre square and the east / west boulevard, means it is highly visible and its proximity to the athletics hall imposes the need for a resoundingly urban attitude.
Following on from the architects’ work on the Mozart urban development zone in Saint-Priest, the intention was to meet the new challenges of the urban environment, promote the use of wood as a material and show that urban living can be pleasurable and fun.Despite the technical complexity of the building, the architectural style is soft and joyful. A different architectural style denotes each of the programme’s components: social housing, the service hub (medical centre), and the retail space at the base.
Various factors relating to the site and the urban planning specifications mean this project has to strike an affirmatively urban posture. The proximity of the athletics hall1 is the main determining factor as the north facade of the housing block is less than 7 metres from the south facade of the sports facility. The scale and unusual shape of the hall make it a benevolent, but demanding neighbour. The focus was placed on developing the links between the new building and the sports facility. To the east, the steps of the square absorb the significant difference in height. To the west the communal garden, suspended above the shops, occupies the gap between the two buildings.
Block 32 acts as an urban facade, preserving the alignment along the road and marking the angles to the east and the west. This form is accentuated by the height of the building, with eight floors for the housing block and six floors for the office space creating a high-density ensemble. The shape of the plot of land is ideal for construction and offers advantageous north and south aspects. The significant height difference from east to west is absorbed by the unifying base that forms a pedestal for the project.
The programme, which adopts the now standard mixed-use approach, is itself an urban microcosm. The two basement floors offer 57 parking spaces. There is 972 m2 of retail space on the ground floor which constitutes the shared base for the 33 housing association flats and the 1,500 m2 medical centre.In terms of style, the different components form a whole, a complete architectural work within which each of the different programmes remains distinct. The domesticity of the housing block is complemented by the more abstract design of the office block, while the retail space opens up readily onto the surrounding public spaces.
The ground floor and first floor which run the entire length of the complex form a glazed pedestal which supports the body which is composed of the two buildings separated by a discontinuity which opens up views onto the inner sections of the complex and the athletics hall. The base of the building effects the transition between the private and public space, with its very specific topography, characterised by a height difference of around 2.5 metres. Above the housing block, an attic floor set back from the main facade crowns the building, marked out by the use of different materials.The construction systems used are also mixed, with materials used where they offer the best possible performance. The main structure is concrete. The facades are composed of a wooden frame.The concrete was used for its structural and acoustic qualities. The wood was chosen first and foremost for its qualities as a material, but also for the way it could be used in the prefabrication of the components that make up the facade.
Two factors made it a particularly suitable material for this project. Wood compound walls offer the same level of performance at a reduced thickness compared to concrete compound walls. Across the seven floors of housing this frees up the equivalent of 60 m2 of living space. The use of prefabricated components also meant the building work could be carried out quickly and safely on a site with very specific constraints, notably due to the close proximity to the athletics hall. The north facade was built in just three weeks.For acoustic reasons the light facades are separated from the flooring. They form a mantle wall which passes over the edge of the slab, producing a seamless envelope.
The housing block is deliberately slender, the depth of living space measures just 8 metres plus the balconies on the south facade, and with the addition of the external hallways on the north facade. This allows all the apartments to benefit from a dual north and south aspect, as each unit runs fully from one side of the building to the other. This exposure develops a generous relationship with the surrounding nature, the new square to the south, and the Monts d’Or to the north. The architectural intent is clear when the profile of the building is viewed from the western corner. The simple organisation of the housing units follows bioclimatic principles: living areas to the south; kitchen, bedrooms and bathrooms to the north.
To the south, generous, two metre-wide balconies offer attractive living spaces and protection from the sun. The windows are larger than standard and compensate for the compact interiors whose dimensions comply with social housing standards.The facade is made up of multiple layers formed by a range of additional features: guard rails of vertical wood slats, yellow cellar-boxes which pattern the structure, balcony partitions, shutters and panels and structural columns.The main facade at the back of the balcony is covered with wood-based fibre and thermosetting resin panels, with a subtle metallic finish, and the front facade with pre-weathered douglas fir slats.
To the north, the thick facade houses the walkways that connect the apartments and the stairwells at the corners of the building which provide vertical access. The walkways, situated on the outside of the building, are wide and open to the distant landscape. The staircases are protected with a perforated metallic cover which maintains a certain level of privacy, opaque from the outside, transparent from the inside.
The office block which houses the medical centre is built in a different style, more abstract, more neutral, with predominantly horizontal lines. The curtain facade is composed of alternating sections of pre-weathered timber cladding boards and wide glazed strips. They form overlapping, offset pieces which interconnect like large scales. This gives the covering a textile-like appearance, lighter and less constructed than the housing block.
In the same way, the two programmes are distinguished by their shape, with the medical centre, unlike the housing block, forming one homogenous block on all four sides. This reflects the typology of the inside floor plan, composed of large open spaces, with each of the main facades tending towards the public space outside: the south facade towards the square, the north facade towards the athletics hall and the east facade towards the square in front of the hall.The fifth facade, overlooked by the neighbouring buildings, has been treated with care with its green roof, and is where the domestic hot water collectors are located.
法国里昂木构公寓丨Tectoniques Architects-25
法国里昂住房外观图
法国里昂木构公寓丨Tectoniques Architects-27
法国里昂木构公寓丨Tectoniques Architects-28
法国里昂木构公寓丨Tectoniques Architects-29
法国里昂住房外部图
法国里昂木构公寓丨Tectoniques Architects-31
法国里昂木构公寓丨Tectoniques Architects-32
法国里昂住房
法国里昂木构公寓丨Tectoniques Architects-34
法国里昂木构公寓丨Tectoniques Architects-35
法国里昂木构公寓丨Tectoniques Architects-36
法国里昂木构公寓丨Tectoniques Architects-37
法国里昂住房图解
法国里昂木构公寓丨Tectoniques Architects-39
法国里昂住房平面图
法国里昂木构公寓丨Tectoniques Architects-41
法国里昂木构公寓丨Tectoniques Architects-42
法国里昂住房截面图
法国里昂木构公寓丨Tectoniques Architects-44
法国里昂住房南向立面图
法国里昂木构公寓丨Tectoniques Architects-46
法国里昂住房详图
法国里昂木构公寓丨Tectoniques Architects-48
法国里昂木构公寓丨Tectoniques Architects-49
法国里昂木构公寓丨Tectoniques Architects-50
法国里昂木构公寓丨Tectoniques Architects-51
法国里昂木构公寓丨Tectoniques Architects-52
法国里昂住房底层平面图
法国里昂木构公寓丨Tectoniques Architects-54
法国里昂木构公寓丨Tectoniques Architects-55
法国里昂住房上层平面图
南京喵熊网络科技有限公司 苏ICP备18050492号-4知末 © 2018—2020 . All photos and trademark graphics are copyrighted by their owners.增值电信业务经营许可证(ICP)苏B2-20201444苏公网安备 32011302321234号